background image

20

21

INSTALLATION AND OPERATION MANUAL SOLAR MODULES Q.PEAK DUO L-G6.3 / BFG AND L-G6.3 / BGT – Q CELLS

INSTALLATION AND OPERATION MANUAL SOLAR MODULES Q.PEAK DUO L-G6.3 / BFG AND L-G6.3 / BGT– Q CELLS

20

 

Ä

Ensure that all necessary safety and functional 
tests have been carried out according to 
applicable standards.

NOTE! Module damage may occur!

 

Ä

Ensure that the plug connections are secured away 
from any water-channelling surface.  

 

Ä

Integrate the system into the existing lightening 
protection system in accordance with the 
applicable local regulations.

WARNING! Fire Risk!

 

Ä

Do not use light concentrators (e.g. mirrors or 
lenses).

 

Ä

Ensure that the cabling is not exposed and/or 
hanging and is protected from dirt, moisture and 
mechanical friction.

4  ELECTRICAL CONNECTION

4.4 AFTER INSTALLATION

 

Ä

No dry cleaning or use of rotating brushes. 

 

Ä

Modules must be cleaned manually and only with 
sufficient water.

Protective Grounding

In order to prevent electrical shock or fire, the frame of the module 
as well as any non-current-carrying metal parts of the system must 
be grounded. While this section provides some information about 
grounding the Q CELLS frames and modules, reference should be 
made to local statutes and regulations for specific requirements 
on grounding. The U.S. National Electrical Code addresses these 
issues in Article 250. 

Proper grounding is achieved by bonding all exposed non-current-
carrying metal equipment to the appropriately sized equipment 
grounding conductor (EGC) or racking system that can be used 
for integrated grounding. 

Q CELLS frames are protected from corrosion with an anodized 
coating, which has to be penetrated in order to ensure proper 
bonding. The different methods listed below are suggested methods 
for an appropriate bond between the frame and the EGC or racking 
system (that will have to be properly grounded). The method appro-
priate for any individual installation will depend on multiple factors.

Option A: Use of a grounding lug

A listed grounding lug can be bonded to the frame using the grounding 
holes pre-drilled in the frame. These holes are marked with a ground 
symbol, as shown below on the frame section drawing: To install the 
grounding lug, follow the specified instructions of the manufacturer. 
The grounding lug should be made of stainless steel or tin plated 
metals such as aluminum to avoid corrosion. 

The grounding lug should be attached to the frame grounding hole 
using a stainless steel screw, toothed lock washer or KEPS nut (in 
order to penetrate the anodized layer) and backing nut. Care should 
be taken to avoid the use of grounding hardware of dissimilar metals, 
which may lead to corrosion.

Option B: Integrated grounding methods

The Q CELLS modules can be bonded with the racking system using 
UL61730 or UL2703 certified integrated grounding methods. The 
racking system will then have to be grounded so that the overall 
system is properly grounded. The listed racking system and grounding 
device should be installed in accordance with the manufacturers’ 
instructions. An example of such integrated grounding method is 
the use of a WEEB clip or Schletter plate between the module and 
the racking system, when mounting the module. 

The WEEB washers are generally compatible with Q CELLS modules, 
however each combination module / racking system requires a specific 
WEEB washer size. Note that WEEB clips are intended for single use 
only; they must not be reused after removal or loosening. Refer to 
Wiley’s installation instructions for the specific use of WEEB washers.

An example of such integrated grounding method is the use of a 
washer recognized as meeting UL2703 requirements between the 
module and the racking system, when mounting the module. For 
example, WEEB washers are generally compatible with Q CELLS 
modules, however each combination module / racking system 
requires a specific WEEB washer size. Note that WEEB washers are 
intended for single use only; they must not be reused after removal 
or loosening. Refer to Wiley’s installation instructions for the specific 
use of WEEB washers.

• 

Dimensions shown are in inches.

0.177” (+0.008/-0)

±0.08

0.79”

0.47”

±

0.08

GROUNDING

PV Laminate

Backing Nut (Stainless Steel)

Toothed Lock Washer (Stainless 
Steel)

Grounding Lug (Stainless Steel 
or tin-plated metal)

Equipment 
Grounding 
Conductor

Aluminum 
Frame

Screw (Stainless Steel)

Summary of Contents for Q.PEAK DUO L-G6.3 / BFG

Page 1: ...Valid for North America INSTALLATION AND OPERATION MANUAL Q PEAK DUO L G6 3 BFG and L G6 3 BGT solar modules ...

Page 2: ... module operator are responsible for com pliance with all applicable statutory requirements and regulations Ä The following regulations and standards must be upheld at all times during the installation operation and maintenance of the solar modules Installation and Operation Manual Other applicable documents such as country specific regu lations for pressure equipment operational safety hazardous ...

Page 3: ...requirements Other applicable documents This installation manual is only valid in combination with the following technical information DOCUMENT TYPE Product data sheet Packaging and transport information MISUSE OR INCORRECT USE OF SOLAR MODULES VOIDS THE LIMITED WARRANTY AND MAY CREATE A SAFETY HAZARD AND RISK PROPERTY DAMAGE THIS INCLUDES IMPROPER INSTALLATIONORCONFIGURATION IMPROPERMAINTENANCE U...

Page 4: ...ce with UL 61730 Installation using a mounting structure for solar modules Mounting Structure Requirements Requirements for the mounting structure Conform to the necessary structural requirements Compliant with local snow and wind loads Properly fastened to the ground the roof or the façade Forces acting on the module are relayed to the mounting sub structure Ensures sufficient rear ventilation of...

Page 5: ...orientation Module Clamp Subconstruction Mounting profile 2 PLANNING 2 3 MOUNTING OPTIONS 2 PLANNING 2 3 MOUNTING OPTIONS TYPE OF INSTALLATION POINT MOUNTING SYSTEM LINEAR MOUNTING SYSTEM INSTALLATION WITH CLAMPS HYBRID CLAMPING INSTALLATION ON MOUNTING POINTS 3 94 9 84 100 250 CL5 9 84 19 7 250 500 NA FB1 4 mounting slots 15 2 386 CL1 0 8 9 8 20 250 9 8 19 7 250 500 CL3 9 8 19 7 250 500 TYPE OF I...

Page 6: ... the subconstruction does not touch the junction box even under load The clamps or insertion profiles etc do not touch the glass even under load Ä Ensure that the connection cables of the junction box do not run between the laminate and mounting rails Ä A minimum support depth of 0 59in 15mm is required on the back side of the module for IP1 IP2 CL2b and CL3 The minimum required support depth on t...

Page 7: ...deter mining the maximum number of modules in the string Parallel Connection Modules may be damaged by the occurrence of reverse currents caused by module defects ground leaks or defective insulation Ä Ensure that the maximum reverse current load capacity indicated in the data sheet is met In order to limit reverse currents that may occur we recommend using the following safety options 1 Layout wi...

Page 8: ...tally as shown NOTE Module damage may occur Ä Never step on modules Ä Do not subject modules to any mechanical stress Ä Do not allow any objects to fall onto modules 3 INSTALLATION 3 1 SAFETY AND TRANSPORT DANGER Risk of fatal injury due to electric shock Ä Block off the installation zone Ä Keep children and unauthorized individuals away from the solar power system DANGER Risk of fatal injury due ...

Page 9: ...may result from the separation of a closed circuit These can result in life threatening injuries The danger increases when several modules are connected in series Ä Please be aware of that the entire open circuit voltage is active even at low levels of solar irradiation Ä Please follow the valid national regulations and safety guidelines for the installation of electrical devices and systems Ä Ple...

Page 10: ...k of fatal injury due to electric shock Ä Electrical work may only be performed by qualified and skilled personnel see page 3 Ä Ensure correct polarity Ä Use solar cables for the connection at the junction box outlet Ä Only interconnect connectors of the same type and manufacturer Ä Use minimum No 12 AWG copper wires insulated for a minimum of 90 C for field connections NOTE Module damage may occu...

Page 11: ...drilled in the frame These holes are marked with a ground symbol as shown below on the frame section drawing To install the grounding lug follow the specified instructions of the manufacturer The grounding lug should be made of stainless steel or tin plated metals such as aluminum to avoid corrosion The grounding lug should be attached to the frame grounding hole using a stainless steel screw toot...

Page 12: ...ections it has to be checked that the components are secure undamaged and clean Cleaning WARNING Risk of injury due to hot and live modules Ä Only clean modules that have cooled down Ä Do not carry or wear any electrically conductive parts WARNING Risk of falling due to unsecured access Ä Never access the installation area alone or without taking ade quate security precautions Ä Please commission ...

Page 13: ...ctrum Center Drive Suite 1400 Irvine CA 92618 USA TEL 1 949 748 59 69 EMAIL inquiry us q cells com WEB www q cells us Subject to change without notice Q CELLS Installation manual solar modules Q PEAK DUO L G6 3_BFG_BGT_2020 10_Rev01_NA ...

Reviews: