INSTALLATION AND OPERATION MANUAL SOLAR MODULES Q.PEAK DUO L-G5.3/BF – Q CELLS

INSTALLATION AND OPERATION MANUAL SOLAR MODULES Q.PEAK DUO L-G5.3/BF – Q CELLS

Fig. 2: 

Installation options for crystalline Q CELLS modules. All dimensions are given in inch (mm in brackets). Also observe 
the maximum test loads and clamping range as specified on page 10.  
The illustrated installation options apply for both horizontal and vertical module orientation. 

 

Module 

Clamp 

Subconstruction 

Mounting profile

TYPE OF 
INSTALLATION

POINT MOUNTING SYSTEM

LINEAR MOUNTING SYSTEM

INSTALLATION 
WITH CLAMPS

HYBRID  
CLAMPING

INSTALLATION  
ON MOUNTING  
POINTS

PLANNING

2.3  MOUNTING OPTIONS

3.94 - 9.84
(100 - 250)

CL5

9.84 - 19.7
(250 - 500)

NA

0.79 - 11.8
(20 - 300)

CL2a

NA

0.79 - 11.8
(20 - 300)

CL2b

NA

FB1

4 × mounting 
slots

13.9
(353.5)

CL1

0.79-9.8

(20-250)

9.8-19.7

(250-500)

CL3

9.8-19.7
(250 - 500)

PLANNING

2.3  MOUNTING OPTIONS

TYPE OF 
INSTALLATION

POINT MOUNTING SYSTEM

LINEAR MOUNTING SYSTEM

INSTALLATION 
WITH INSERTION 
PROFILES

NOT PERMITTED

TRACKER  
INSTALLATION
ON MOUNTING
POINTS

TRACKER  
INSTALLATION
WITH CLAMPS

IP1

IP2

TB1

31.8

(807.5)

TC1

31.5 - 33.9
(800 - 860)

Summary of Contents for Q.PEAK DUO L-G5.3/BF

Page 1: ...Valid for North America INSTALLATION AND OPERATION MANUAL Q PEAK DUO L G5 3 BF solar modules...

Page 2: ...operator are responsible for com pliance with all applicable statutory requirements and regulations The following regulations and standards must be upheld at all times during the installation operatio...

Page 3: ...ulfillment of these requirements Other applicable documents This installation manual is only valid in combination with the following technical information DOCUMENT TYPE Product data sheet Packaging an...

Page 4: ...with IEC 61215 and Design Load 1 5 in accordance with UL 1703 Installation using a mounting structure for solar modules Mounting Structure Requirements Requirements for the mounting structure Conform...

Page 5: ...ubconstruction Mounting profile TYPE OF INSTALLATION POINT MOUNTING SYSTEM LINEAR MOUNTING SYSTEM INSTALLATION WITH CLAMPS HYBRID CLAMPING INSTALLATION ON MOUNTING POINTS 2 PLANNING 2 3 MOUNTING OPTIO...

Page 6: ...system supplier The Q CELLS listed test load values were determinded with the following clamp parameters clamp width 1 58in 40mm and clamp depth 0 39in 10mm The system installer is responsible for the...

Page 7: ...deter mining the maximum number of modules in the string Parallel Connection Modules may be damaged by the occurrence of reverse currents caused by module defects ground leaks or defective insulation...

Page 8: ...n NOTE Module damage may occur Never step on modules Do not subject modules to any mechanical stress Do not allow any objects to fall onto modules 3 INSTALLATION 3 1 SAFETY AND TRANSPORT DANGER Risk o...

Page 9: ...arcs may result from the separation of a closed circuit These can result in life threatening injuries The danger increases when several modules are connected in series Please be aware of that the ent...

Page 10: ...odules proceed in reverse order DANGER Risk of fatal injury due to electric shock Electrical work may only be performed by qualified and skilled personnel see page 3 Ensure correct polarity Use solar...

Page 11: ...nt electrical shock or fire the frame of the module as well as any non current carrying metal parts of the system must be grounded While this section provides some information about grounding the Q CE...

Page 12: ...Equipment Grounding Conductor Aluminum Frame Screw Stainless Steel Q CELLS solar modules are known for a long operating life and minimal maintenance effort and expense Dirt and grime are usually washe...

Page 13: ...A 92618 USA TEL 1 949 748 59 69 EMAIL inquiry us q cells com WEB www q cells us Subject to change without notice Q CELLS Installation manual solar modules Q PEAK DUO L G5 3_BF_2020 08_Rev02_NA 24 INST...

Reviews: