Module Selection

For detailed key electrical data, please refer to the actual data sheet 
referring to the relevant Module (available at www.q-cells.com).

 

Ä

For maximum energy yields, mismatches of specified electric 
current (I

MPP

) of more than 5 % should be avoided for all modules 

connected in series.

Safety Factor

During normal operation, a module may generate a greater current 
and / or higher voltage than that determined under standardized 
test conditions. Please use a safety factor of 1.25 for the following:

• 

Calculating the voltage measurement values (V

OC

) of components

• 

Calculating the current measurement values (I

SC

) of conductors

• 

Sizing of control systems connected to the outlets of the solar 
modules

 

Ä

Please follow the valid national guidelines for the installation 
of electrical systems.

Series Connection

Connection of modules in series is only permitted up to the 
maximum system voltage as listed in the applicable data sheet 
of all the relevant modules to be installed.

 

Ä

Take into account all possible operating situations and all 
relevant technical norms and regulations when designing the 
system. It has to be ensured that the maximum system voltage, 
including all necessary safety margins, is not exceeded.

 

Ä

Take the voltage limit of the inverter into account when 
determining the maximum number of modules in the string.

Parallel Connection

Modules may be damaged by the occurrence of reverse currents 
(caused by module defects, ground leaks, or defective insulation).

 

Ä

Ensure that the maximum reverse current load capacity 
indicated in the data sheet is met.

In order to limit reverse currents that may occur, we recommend 
using the following safety options:

1) 

Layout with a limited number of 
parallel connected strings :

Without undertaking further current blocking measures, a maximum 
of two module strings may be operated in parallel on a single 
inverter or MPP tracker.

2) 

Layout with string fuses :

Use overcurrent devices (e.g. fuses) according to the relevant 
standards in each string. Use gPV-fuses according to IEC 60269-6. 
Observe the maximum permitted number of strings as indicated 
in the specifications provided by the respective string fuse 
manufacturer and the technical guidelines.

NOTE!

When installing different product versions, the lowest minimum 
permitted reverse current load capacity applies.

Inverters

Inverters with or without transformers may be used.

2  PLANNING

2.4 ELECTRICAL LAYOUT

3  INSTALLATION

3.1  SAFETY AND TRANSPORT

 

Ä

Leave modules in their original packaging until 
installation.

 

Ä

Store the modules securely in cool and dry 
rooms. The packaging is not weatherproof.

 

Ä

Inspect the packaging for damages.

 

Ä

Contact the transport company regarding 
any damage to the packaging and follow their 
instructions.

 

Ä

Follow any instructions on the packaging.

 

Ä

Ensure that all personnel are aware of and 
adhere to accident-prevention and safety 
regulations.

 

Ä

While working wear clean gloves.

§

GB

§

I

§

D

Danger! Risk of fatal injury due to electric 
shock!

 

Ä

Do not install damaged modules.

 

Ä

Inform your distributor of any damages 
immediately.

Warning! Fire Risk!

 

Ä

Do not install modules indoors.

 

Ä

Do not install modules on moving objects.

Summary of Contents for Q.PEAK DUO-G10 Series

Page 1: ...INSTALLATION AND OPERATION MANUAL Q PEAK DUO G10 X solar module series Valid for Africa Europe LatinAmerica South America...

Page 2: ...y hazardous goods and environmental protection Regulations and requirements specific to the system Any applicable laws and requirements in particular inter national country specific regional laws and...

Page 3: ...are relevant DOCUMENT TYPE Product data sheet Packaging and transport information External dimensions and components for Q PEAK DUO G10 Q PEAK DUO G10 Q PEAK DUO G10 a Q PEAK DUO G10 a Q PEAK DUO G10...

Page 4: ...orces acting on the module are relayed to the mounting substructure Ensures sufficient rear ventilation of the module Avoid the usage of different metals to prevent contact corrosion Allows for stress...

Page 5: ...qui rements Ensure that the connection cables of the junction box do not run between laminate and mounting rails Modules bend under load Therefore sharp objects e g screws ballast stones rail ends rai...

Page 6: ...nce of reverse currents caused by module defects ground leaks or defective insulation Ensure that the maximum reverse current load capacity indicated in the data sheet is met In order to limit reverse...

Page 7: ...te Module damage may occur Never step on modules Do not subject modules to any mechanical stress Do not allow any objects to fall onto modules 3 INSTALLATION 3 1 SAFETY AND TRANSPORT Danger Risk of fa...

Page 8: ...fe threatening injuries The danger increases when several modules are connected in series Please be aware of that the entire open circuit voltage is active even at low levels of solar irradiation Plea...

Page 9: ...personnel see page 3 Ensure correct polarity Use solar cables for the connection at the junction box outlet Only interconnect connectors of the same type and manufacturer Use minimum 4mm2 copper wire...

Page 10: ...ht concentrators e g mirrors or lenses Ensure that the cabling is not exposed and or hanging and is protected from dirt moisture and mechanical friction 4 ELECTRICAL CONNECTION 4 4 AFTER INSTALLATION...

Page 11: ...age may occur Remove snow and ice carefully without force e g with a very soft broom Do not scratch off dirt Module cleaning has to be done by qualified personnel according to the state of the art and...

Page 12: ...ee 17 21 06766 Bitterfeld Wolfen Germany TEL 49 0 34946699 23222 FAX 49 0 34946699 23000 EMAIL sales q cells com WEB www q cells com Subject to change without notice Q CELLS Installation manual solar...

Reviews: