Specifications

MODULE TYPE

MOUNTING
OPTION

POSITION OF 
CLAMPS* [MM]

TEST LOAD 
PUSH / PULL**  [PA] 

DESIGN LOAD 
PUSH / PULL**  [PA] 

SAFETY 
FACTOR

Q.PEAK DUO-G9

Q.PEAK DUO-G9+

Q.PEAK DUO BLK-G9

Q.PEAK DUO BLK-G9+

CL1a

150 - 450

5400 / 4000

3600 / 2660

1.5

FB1

346.5

FB2

346.5

3300 / 4000

2200 / 2660

IP1

-

3300 / 3300

2200 / 2200

CL1a

20 - 550

2400 / 2400

1600 / 1600

CL1b

20 - 550

CL2a (with rails)

20 - 300

CL2b (without 

rails)

20 - 300

CL3

250 - 450

4000 / 4000

2660 / 2660

CL5

short side: 100 - 250
long side: 300 - 450

3800 / 3800

2530 / 2530

CL6b

short side: 100 - 250
middle: 640 - 1030****

6000 / 4000

4000 / 2660

 

Ä

The below mounting options are only possible under certain conditions.

MODULE TYPE

MOUNTING 
OPTION

POSITION OF 
CLAMPS* [MM]

TEST LOAD 
PUSH / PULL*** 
[PA] 

DESIGN LOAD 
PUSH / PULL*** 
[PA] 

SAFETY 
FACTOR

Q.PEAK DUO-G9

Q.PEAK DUO-G9+

Q.PEAK DUO BLK-G9

Q.PEAK DUO BLK-G9+

IP2

-

2400 / 2200

1600 / 1460

1.5


** 
***
****

Distance between outer edge of module and middle of the clamp; consider further details below.
Loads according to IEC 61215-2:2016 and UL 61730.
Test procedure according to IEC 61215-2:2016 and UL 61730. Loads for these mounting options do not fulfill the requirements of the standards.
Rails must not be under the junction box.

ATTENTION

 

Ä

The loads in the table are related to the mechanical stability of the solar modules. The mechanical stability of the mounting 
system including clamps has to be evaluated by the system supplier. The Q CELLS listed test load values were determined 
with the following clamp parameters: clamp width = 40 mm and clamp depth = 10 mm. The system installer is responsible for 
the determination of location-specific load requirements.

 

Ä

CL1a at high loads (5400 / 4000 Pa): The clamp position is variable in the given range but the distance between the clamps 
along the long side of the module (span) must not be larger than 1070 mm.

 

Ä

CL1b: Using of short mounting rails are permissible, if they overlap with the module less than 210 mm. Minimum height of the 
short mounting rails should be ≥ 35 mm (clearance between frame bottom edge and roof top).

 

Ä

Ensure, that the subconstruction does not touch the junction box (even under load). Ensure that the clamps or insertion profiles 
etc. do not touch the glass (even under load).

 

Ä

Ensure, that the connection cables of the junction box do not run between laminate and mounting rails.

 

Ä

A minimum support depth of 15 mm is required on the back side of the module for IP1, IP2, CL2b, CL3 and CL6b. The minimum 
required support depth on the module backside for CL5 is 10 mm on long frame side and 15 mm on short frame side. For IP1 
and IP2 the minimum support depth on the front side of the module should be 10 mm.

 

Ä

CL1a, CL2a and CL3: Ensure that module frame is fixed directly on the rail of the substructure (no spacer allowed between 
the module and substructure).

 

Ä

Module bends under load. Therefore, sharp objects (e.g. screws) must not be mounted near the module backside.

 

Ä

Unbalanced snow loads (e.g. snow overhangs, snowdrifts) which result in locally significantly increased loads must be removed 
or avoided by technical measures.

 

Ä

Use M8 corrosion-proof screws and washers (diameter ≥ 15.8 mm or ≥ 0.62 in) for FB1 and FB2 mounting. Mounting screws 
and washers should have the same material properties.

2  PLANNING

2  PLANNING

2.3  MOUNTING OPTIONS

2.3  MOUNTING OPTIONS

Summary of Contents for DUO-G9 Series

Page 1: ...INSTALLATION AND OPERATION MANUAL Q PEAK DUO G9 X solar module series Valid for Africa Europe LatinAmerica South America ...

Page 2: ...ipulations such as country specific regulations for pressure equipment operational safety hazardous goods and environmental protection Regulations and requirements specific to the system Any applicable laws and requirements in particular inter national country specific regional laws and stipulations governing the planning installation and operation of solar power systems and work on roofs Any vali...

Page 3: ...quirements prior to installation of the solar power system Your financial success depends on the fulfillment of these requirements Other applicable documents In addition to this Manual following technical information are relevant DOCUMENT TYPE Product data sheet Packaging and transport information Fig 1 External dimensions and components for Q PEAK DUO G9 Q PEAK DUO G9 Q PEAK DUO BLK G9 and Q PEAK...

Page 4: ...ls to prevent contact corrosion Allows for stress free expansion and contraction due to temperature fluctuations Ä Ensure that no additional forces are applied through the mounting system into the module except for the wind and snow loads Additional forces and moments of torque at the mounting positions caused by torsions displacements or vibrations in the mounting system are not allowed Ä Ensure ...

Page 5: ...ameters clamp width 40mm and clamp depth 10mm The system installer is responsible for the determination of location specific load requirements Ä CL1a at high loads 5400 4000Pa The clamp position is variable in the given range but the distance between the clamps along the long side of the module span must not be larger than 1070mm Ä CL1b Using of short mounting rails are permissible if they overlap...

Page 6: ...everse currents caused by module defects ground leaks or defective insulation Ä Ensure that the maximum reverse current load capacity indicated in the data sheet is met In order to limit reverse currents that may occur we recommend using the following safety options 1 Layout with a limited number of parallel connected strings Withoutundertakingfurthercurrentblockingmeasures amaximum of two module ...

Page 7: ...odule damage may occur Ä Never step on modules Ä Do not subject modules to any mechanical stress Ä Do not allow any objects to fall onto modules 3 INSTALLATION 3 1 SAFETY AND TRANSPORT Danger Risk of fatal injury due to electric shock Ä Block off the installation zone Ä Keep children and unauthorized individuals away from the solar power system Danger Risk of fatal injury due to electric shock Ä E...

Page 8: ...rom the separation of a closed circuit These can result in life threatening injuries The danger increases when several modules are connected in series Ä Please be aware of that the entire open circuit voltage is active even at low levels of solar irradiation Ä Pleasefollowthevalidnationalregulationsandsafetyguidelines for the installation of electrical devices and systems Ä Please make sure to tak...

Page 9: ...el see page 3 Ä Ensure correct polarity Ä Use solar cables for the connection at the junction box outlet Ä Only interconnect connectors of the same type and manufacturer Ä Use minimum 4mm2 copper wires insulated for a minimum of 90 C for field connections Note Module damage may occur Ä Ensure that the cabling is not under mechanical stress Comply with bending radius of 60mm Ä Ensure that the cable...

Page 10: ...bling is not exposed and or hanging and is protected from dirt moisture and mechanical friction 4 ELECTRICAL CONNECTION 4 4 AFTER INSTALLATION Ä No dry cleaning or use of rotating brushes Ä Modules must be cleaned manually and only with sufficient water Protective Grounding Ä The modules must be grounded in accordance with the local statutory regulations DANGER Risk of fatal injury due to electric...

Page 11: ...arry or wear any electrically conductive parts WARNING Risk of falling due to unsecured access Ä Never access the installation area alone or without taking adequate security precautions Ä Please commission a trade specialist NOTE Module surface damage may occur Ä Remove snow and ice carefully without force e g with a very soft broom Ä Do not scratch off dirt Ä Rinse dirt dust leaves etc off with l...

Page 12: ...lee 17 21 06766 Bitterfeld Wolfen Germany TEL 49 0 34946699 23222 FAX 49 0 34946699 23000 EMAIL sales q cells com WEB www q cells com Subject to change without notice Q CELLS Installation manual solar modules Q PEAK DUO G9 X_2021 08_Rev03_EN ...