Operating Manual: PX-1C - Smoke Alarm Device with Radio Link
EN
57
EN
(3)
Press the magnet carrier firmly for about
10 seconds at the mounting position.
(4)
Take the device into operation and set
it up.
f
Observe chapter 6 “Initial commission-
ing and setting up“ on page 60.
(5)
Position the device on the magnet
carrier.
5
The device is mounted on the
magnet carrier.
The ultimate strength of the adhe-
sive bond is achieved after about
72 hours.
Adhesive mounting according
to EN 14604:2005/AC:2008
and vfdb 14/01 (Q)
To establish a permanent connection
between the device and magnet carrier
(e.g., as theft protection), you can addition-
ally mount the device with the supplied
adhesive film on the magnet carrier.
CAUTION
Possible property damage!
Mounting the device in accordance
with vfdb 14/01 (Q) establishes a
permanent connection between
magnet carrier and the device. Thus,
a subsequent removal of the device
is prevented. The start-up and set up
of the device are no longer possible.
If the device is disassembled, it can
cause damage to the device and the
mounting surface.
f
Use the additional adhesive film
only to prevent theft.
f
Put the device into operation
and set it up before attaching the
additional adhesive film.
Summary of Contents for PX-1C
Page 82: ...82 DE EN Platz für Ihre Notizen Space for your notes ...
Page 83: ...83 DE EN ...