Summary of Contents for UP5000

Page 1: ...Page 1 Contact SegenSolar PTY Ltd e info segensolar co za t 08780 20663 PYLONTECH Product Presentation...

Page 2: ...Page 2 Contact SegenSolar PTY Ltd e info segensolar co za t 08780 20663 01 PRODUCT OVERVIEW 03 INSTALLATION 04 MULTIPLE STRINGS 02 APPLICATION CONFIGURATION 05 TROUBLESHOOTING...

Page 3: ...Page 3 Contact SegenSolar PTY Ltd e info segensolar co za t 08780 20663 PRODUCT OVERVIEW 01...

Page 4: ...parameters 2 Double single string module quantity 95 DoD Double installation altitude Pre charge smooth inrush current Dual active protection enhanced safety Flexible current steps enable 50 more powe...

Page 5: ...5 DoD Double installation altitude Pre charge smooth inrush current Dual active protection enhanced safety Flexible current steps enable 50 more power during critical temperature condition Dry contact...

Page 6: ...ewable Australia shows the estimated state of health SOH against cycles completed for each Phase 2 battery pack still cycling SOH is estimated by dividing the energy delivered at each capacity test by...

Page 7: ...posses A DoD 95 B Weight 40kG for a 5kWh module C Power strength Available for max 1C rate operation peak up to 200 Amps 15 sec per single module D Safety IEC CE UL UN38 3 proved E Expansion Max 70kW...

Page 8: ...Page 8 Contact SegenSolar PTY Ltd e info segensolar co za t 08780 20663 APPLICATION CONFIGURATION 02...

Page 9: ...Page 9 Contact SegenSolar PTY Ltd e info segensolar co za t 08780 20663 Application...

Page 10: ...Page 10 Contact SegenSolar PTY Ltd e info segensolar co za t 08780 20663 Back up Peak Shaving PV ESS Inverter Hybrid Residential...

Page 11: ...5 5 43 2 35 5 33 7 11 19 5 39 1 47 5 39 1 37 1 12 21 3 42 6 51 8 42 6 40 5 13 23 1 46 2 56 2 46 2 43 9 14 24 9 49 7 60 5 49 7 47 2 15 26 6 53 3 64 8 53 3 50 6 16 28 4 56 8 69 1 56 8 54 0 1 Rated Power...

Page 12: ...8 25 9 28 8 27 4 7 16 8 33 6 30 2 33 6 31 9 8 19 2 38 4 34 6 38 4 36 5 9 21 6 43 2 38 9 43 2 41 0 10 24 0 48 0 43 2 48 0 45 6 11 26 4 52 8 47 5 52 8 50 2 12 28 8 57 6 51 8 57 6 54 7 13 31 2 62 4 56 2...

Page 13: ...Page 13 Contact SegenSolar PTY Ltd e info segensolar co za t 08780 20663 INSTALLATION 03...

Page 14: ...genSolar PTY Ltd e info segensolar co za t 08780 20663 CHECKING LIST For battery module package 1 PC pair of power cables 1 PC grounding cable 1 PC user manual and warranty card Figure 4 US3000C batte...

Page 15: ...egenSolar PTY Ltd e info segensolar co za t 08780 20663 For battery module package 1 PC pair of power cables 1 PC grounding cable 1 PC user manual and warranty card CHECKING LIST Figure 5 UP5000 batte...

Page 16: ...d e info segensolar co za t 08780 20663 External cable kits 1 Pair of power cables NB Please apply an advised communication cable with corresponding pin definitions of two terminals Figure 6 Battery e...

Page 17: ...Page 17 Contact SegenSolar PTY Ltd e info segensolar co za t 08780 20663 Before You Start Installation Manual Location Environment Tools Accessories Compatible Inverter...

Page 18: ...Page 18 Contact SegenSolar PTY Ltd e info segensolar co za t 08780 20663 1 Battery Module Front Interface US3000C Figure 7 US3000C battery module front interface Installation...

Page 19: ...Page 19 Contact SegenSolar PTY Ltd e info segensolar co za t 08780 20663 1 Battery Module Front Interface UP5000 Figure 8 UP5000 battery module front interface Installation...

Page 20: ...ge 20 Contact SegenSolar PTY Ltd e info segensolar co za t 08780 20663 2 Cable connection Figure 10 UP5000 battery cable connection diagram Figure 9 US3000C battery cable connection diagram Installati...

Page 21: ...Page 21 Contact SegenSolar PTY Ltd e info segensolar co za t 08780 20663 Figure 11 Battery communication port pin definitions 2 Cable connection Installation...

Page 22: ...ication cable connection The one with empty Link Port 0 is the Master Battery Module Which is connected to the Inverter other batteries are slave batteries 1 Master Battery configure with maximum 15 S...

Page 23: ...le connection 1 Based on metal directly touch between the module s surface and rack s surface If using painted rack the corresponding place shall remove the painting 2 Install a grounding cable to the...

Page 24: ...Page 24 Contact SegenSolar PTY Ltd e info segensolar co za t 08780 20663 Power 5kW 5kW Power 10kW Figure 16 Battery power cable connection diagram Installation...

Page 25: ...8780 20663 1 Power on Double check all the power cable and communication cable 1 Switch ON all the battery modules by hard switch 2 Press the Red SW button of master battery 0 5 sec Figure 17 Battery...

Page 26: ...ery is ready to have a high power output after soft start operation is finished 2 During capacity expansion or replacement when paralleling different SOC voltage of modules together please maintain th...

Page 27: ...o segensolar co za t 08780 20663 2 Power OFF Double check all the power wires and communication cables 1 Press the Red SW button of the master battery 0 5 sec 2 Switch OFF the battery modules Figure 1...

Page 28: ...and Suitable battery type Communication Application Key features Installation Activation Force charge Kodak US2000 US30 00 US2000C US3 000C UP2500 UP50 00 RS485 Off grid Yes Yes Wall mounting Victron...

Page 29: ...nsolar co za t 08780 20663 Connection Diagram Figure 19 Pylontech batteries with Kodak inverter connection diagram RS485 BAT inverter Pin1 Pin2 Pin3 485B Pin4 Pin5 485A Pin6 Pin7 485A Pin8 485B Suitab...

Page 30: ...or SOL setting 2 Choose PYLON in the 5th setting 3 Select suitable frequency in the 9th setting 4 If you apply SBU mode except for the first 3 steps the 11th setting the maximum charge current from g...

Page 31: ...n8 CAN L Comm Cable PINOUT ADD Switch You must use the VE Can to CAN bus BMS type B Cable part number ASS030720018 for connection with US2000 US3000 UP2500 and VE Can to CAN bus BMS type A Cable part...

Page 32: ...ntify Pylontech 2 Go to settings open DVCC 4 Go to settings open ESS 5 Choose suitable operation mode 6 If you choose Optimized please set minimum SOC at 10 or 5 7 Connect inverter to host computer 3...

Page 33: ...lar co za t 08780 20663 Connection Diagram Sunsynk Figure 21 Pylontech batteries with Sunsynk inverter connection diagram CAN BAT inverter Pin1 Pin2 Pin3 Pin4 CAN H CAN H Pin5 CAN L CAN L Pin6 Pin7 Pi...

Page 34: ...Configuration Sunsynk 1 Press Enter Gear icon to go to setup menu 2 Press Battery 3 Press Shut Down and Set Shut down at 3 Low Batt at 5 5 Tick BMS_Err_Stop 4 Press Batt type Choose battery mode Lith...

Page 35: ...Page 35 Contact SegenSolar PTY Ltd e info segensolar co za t 08780 20663 MULTIPLE STRINGS 04...

Page 36: ...en turn ON batteries R is the baud rate of RS485 needed all master batteries shall be the same After all batteries are in running mode the buzzer of master battery in group1 will ring 3 times This mea...

Page 37: ...ll batteries are in running mode the buzzer of master battery in group1 will ring 3 times This means that all groups are online 3 Change the dip switch of master battery in group1 to 0100 Then connect...

Page 38: ...er SOH may have a difference on SOC with the existing system but it will not affect the parallel connection system performance Mixing using master battery priority US3000C US2000C US3000 US2000 For sa...

Page 39: ...Page 39 Contact SegenSolar PTY Ltd e info segensolar co za t 08780 20663 TROUBLE SHOOTING 05...

Page 40: ...rts 3 Pin definitions of communication cables Solution Please refer to pin definition diagrams Functional related problems 1 Battery over discharged Solution Please use a DC charger to charge the batt...

Page 41: ...ference list 1 Pylon Technologies Co Ltd Rechargeable Li ion Battery US3000C Operation Manual Version 20CQSV1103 2 Pylon Technologies Co Ltd Rechargeable Li ion Battery UP5000 Operation Manual Version...

Page 42: ...Page 42 Contact SegenSolar PTY Ltd e info segensolar co za t 08780 20663 Thank you To recap on todays webinar please visit our portal...