CONQUEST
®
WATER HEATER
3
PV500-70 10/15
10.2 Status Field Display
10.3 Operational Sequence Field Display
10.4 View Menu (Home Screen - Default Display)
10.5 Control System Menus
10.6 Changing the Operating Set Point
10.7 Setting the Real Time Clock
10.8
Scheduled
Setback
10.9 Using the Manual Override Menu
10.10 Potentiometer (Operating Set Point for Standalone Operation)
10.11 Using Tool Box Menu
11.
Communications and Diagnostics
11.1 Indicators
11.2 Alarm Messages – Diagnostic Codes (Flashes)
11.3 Replacing
the
Fuse
11.4 Self-Check/Control
Failure
11.5 System
Safety
Checks
11.6 Flame Current Measurements
11.7 Non-Volatile
Lockout/Manual
Reset
11.8 ID
Card
12. Network
Menu
12.1 EOS Register List
12.2 Error
Codes
13.
Remote Connections – Terminal Strip
13.1 Making BMS/BAS Remote Connection for Analog and Binary Signals
13.2
Terminal
Functions
14. Sequence
of
Operation
15. Initial
Startup
15.1
Initial
Startup
Requirements
15.2 Tools and Instrumentation Required
15.3
Resources
15.4 On Site Considerations
15.5
Startup
Procedure
16.
NSF Food Service Installation Guidelines
17. Troubleshooting
Procedure
17.1 General
Troubleshooting
17.2 LED
Error
Code
Listing
18. Replacement
Parts
18.1 Burner
Assemblies
18.2 Control
Panel
Components
18.3 Gas
Train
Assembly
18.4 Drain Valve –T&P Relief Valve – Integral Circulating Pump Assembly
18.5 Condensate Drain Trap and Optional Condensate Neutralizer
18.6 Component Wiring and Conduit Routing Details
19. Periodic
Maintenance
20. Recommended
Maintenance
Schedule
21.
Requirements for the Commonwealth of Massachusetts