SPP Operation Manual
Revision A
/
May 2021
Page 26 of 34
35.
Push the metering sleeve through the bottom of the metering body.
Figure 34: Push Metering Sleeve
36.
Reattach the upper manifold block.
37.
Install the four M6 screws using a 6 mm hex key.
Figure 35: Install Upper Manifold Block