
Installation Guide / SolarRoof Tilt Legs
16
Code-Compliant Planning and Installation Guide V 5.1 - Complying with AS/NZS1170.2-2011 AMDT 2-2016
Fixed Tilt Legs
1
. End Clamp
2
. Inter Clamp
3
. Grounding Clip
4
. ECO-Rail
5
. Grounding Lug
6
. Fixed Tilt Legs
- System Overview -
①
②
③
④
⑤
⑥
Precautions during Stainless Steel Fastener Installation
Improper operation may lead to deadlock of Nuts and Bolts. The steps below should be applied to stainless steel nut
and bolt assembly to reduce this risk.
General installation instructions:
(1) Apply force to fasteners in the direction of thread
(2) Apply force uniformly, to maintain the required torque
(3) Professional tools and tool belts are recommended
(4) In some cases, fasteners could be seized over time. As an option, if want to avoid galling or seizing of thread, apply
lubricant (grease or 40# engine oil) to fasteners prior to tightening.