Section Two: Install the Standoff

1: 

Determine the fixture height (H) from the bottom of the 

    channel to the top of the canopy.

2:

 Determine the fixture length (L). Measure the distance 

    between the coaxial cable and the aircraft cable on the 
    channel. Mark the standoff location on the ceiling from the 
    center of the junction box.

E

NOTE:

 

Run the proper size wires between the 24VDC power 

supply to the electrical box. Refer to the instructions provided 
with the power supply for additional information.

TOP VIEW

ANCHOR

ANCHOR MUST 

BE FLUSH TO WALL

F

3:

 Tap the anchors onto the marked points up to the threaded 

    portion with a hammer.

4:

 Screw in the threaded portion of the anchors with a Phillips 

    screwdriver.

CEILING

3

4

H

CHANNEL

CANOPY

STANDOFF

COAXIAL CABLE

AIRCRAFT
CABLE

L

STANDOFF

CANOPY

1

NOTE: 

Omit steps 5 through 10 if using support canopy. Refer 

to Section Three: Install the Support Canopy.

2

JUNCTION BOX

5:

 Feed the #6 screw through the washer with threaded 

    nipple into the anchor.

6:

 Tighten the #6 screw completely into the anchor.

7: 

Tighten the standoff post completely onto the threaded 

    nipple.

G

#6 SCREW

WASHER 
WITH
THREADED
NIPPLE

5

STANDOFF
POST

7

JBOX

  8:

 Feed the aircraft cable coming from the channel through the 

      standoff post.

  9:

 Adjust the fixture height by pushing the tab and pulling the 

      aircraft cable out of the side of the standoff post. Release 
      the tab to secure the cable in place.

10:

 If necessary, trim excess aircraft cable using sharp cutters.

H

STANDOFF
POST

AIRCRAFT
CABLE

8

9

10

EXCESS
AIRCRAFT
CABLE

6

NOTE:

 

Omit Section Six if the channel is made out of a single 

piece.

Summary of Contents for ZSD-2R Series

Page 1: ...ing post back onto the channel and secure it by tightening the two 4 40 set screws with the 0 05 Allen wrench 4 Repeat Steps 1 through 3 for aircraft cables D SAVE THESE INSTRUCTIONS This product is s...

Page 2: ...river CEILING 3 4 H CHANNEL CANOPY STANDOFF COAXIAL CABLE AIRCRAFT CABLE L STANDOFF CANOPY 1 NOTE Omit steps 5 through 10 if using support canopy Refer to Section Three Install the Support Canopy 2 JU...

Page 3: ...g the aircraft cable out of the side of the standoff post Release the tab to secure the cable in place 7 If necessary trim excess aircraft cable using sharp cutters K 6 SCREW WASHER WITH THREADED NIPP...

Page 4: ...ing to the junction box using two 8 32 screws 8 Plaster and finish around the junction box opening 9 Complete the installation by following the steps in Section Five CEILING For Remodeling N CUT DRYWA...

Page 5: ...or covers and remove from the connector assembly Q CONNECTOR ASSEMBLY COAXIAL CONNECTOR COVER COAXIAL CONNECTOR COVER 5 R 1 5MM ALLEN WRENCH 2MM ALLEN WRENCH M4 SET SCREW M3 SET SCREW 6 7 6 Using the...

Page 6: ...vided 1 5mm Allen wrench to replace and securely tighten the M3 set screw 1 5MM ALLEN WRENCH 11 CONNECTOR ASSEMBLY COAXIAL CABLE M3 SET SCREW U 12 Use the provided 2mm Allen wrench to securely tighten...

Page 7: ...If applicable multiple channels must be installed one by one NOTE Omit this section if the joiner did not come with the fixture depending on the overall fixture length 1 Lift the other end of the air...

Page 8: ...back into the channel TOP VIEW Z3 6 SCREW WASHER WITH THREADED NIPPLE 4 STANDOFF POST 6 4 Feed the 6 screw through the washer with threaded nipple into the anchor 5 Tighten the 6 screw completely int...

Page 9: ...ches from one side of the tape backing Attach the adhesive tape to the back of the soft strip and apply moderate pressure to affix the tape Continue this step a few inches at the time until the entire...

Page 10: ...e Standoff Black Line GND Input 120VAC 2 Canopy General ELV Wiring Diagram General 0 10V Wiring Diagram Coaxial Cable Aircraft Cable Standoff 2 Canopy GND 0 10V Dimmer White Neu Black Line Red Load Gr...

Reviews: