background image

SAVE THESE INSTRUCTIONS!

- This product is ceiling mount only.
- The Nova Ceiling Channel should be used with modular 
  connectors only.

IMPORTANT INFORMATION

1718 W. Fullerton Chicago, IL 60614
Ph: 773.770.1195 ● Fax: 773.935.5613
www.PureEdgeLighting.com ● [email protected]
© 2016 PureEdge Lighting. All Rights Reserved. 

Doc # 904-NCM_01

Installation Instructions for 

Nova Ceiling Channel Modular

NCM-__

1:

 Lay out all channels, connectors, clips and other required components on the floor as a guide to determine where the 

    modular system will be located.

2:

 Make all necessary markings on the ceiling which will consist of the channel ends and locking clips. Clips must be installed 

    maximum 24" from each other.

Section One: Install Locking Clips

NOTE:

 

If applicable, the channel must pass through the center of the junction box.

CEILING

LOCKING CLIP

LOCKING CLIP

LOCKING CLIP

MAX 24"

MAX 24"

1

A

CHANNEL
END

NOTE:

 

Steps 2 and 3 are for drywall mounting. Omit these steps 

if mounting the clips to a wood surface directly.

ANCHOR

ANCHOR MUST 

BE FLUSH TO WALL

B

2:

 Tap the anchors onto the marked points up to the threaded 

    portion with a hammer.

3:

 Screw in the threaded portion of the anchors with a Phillips 

    screwdriver.

CEILING

3

2

C

4:

 Line up each locking clip to the anchors and secure them by tightening the two #6 screws through the locking clip holes into 

    the anchors.

CEILING

LOCKING CLIP

LOCKING CLIP

ANCHOR

#6 SCREW

4

1

Reviews: