SAVE THESE INSTRUCTIONS!
- This product is ceiling mount only.
- The Nova Ceiling Channel should be used with modular
connectors only.
IMPORTANT INFORMATION
1718 W. Fullerton Chicago, IL 60614
Ph: 773.770.1195 ● Fax: 773.935.5613
www.PureEdgeLighting.com ● [email protected]
© 2016 PureEdge Lighting. All Rights Reserved.
Doc # 904-NCM_01
Installation Instructions for
Nova Ceiling Channel Modular
NCM-__
1:
Lay out all channels, connectors, clips and other required components on the floor as a guide to determine where the
modular system will be located.
2:
Make all necessary markings on the ceiling which will consist of the channel ends and locking clips. Clips must be installed
maximum 24" from each other.
Section One: Install Locking Clips
NOTE:
If applicable, the channel must pass through the center of the junction box.
CEILING
LOCKING CLIP
LOCKING CLIP
LOCKING CLIP
MAX 24"
MAX 24"
1
A
CHANNEL
END
NOTE:
Steps 2 and 3 are for drywall mounting. Omit these steps
if mounting the clips to a wood surface directly.
ANCHOR
ANCHOR MUST
BE FLUSH TO WALL
B
2:
Tap the anchors onto the marked points up to the threaded
portion with a hammer.
3:
Screw in the threaded portion of the anchors with a Phillips
screwdriver.
CEILING
3
2
C
4:
Line up each locking clip to the anchors and secure them by tightening the two #6 screws through the locking clip holes into
the anchors.
CEILING
LOCKING CLIP
LOCKING CLIP
ANCHOR
#6 SCREW
4
1