Pure n Natural Systems, Inc.
www.purennatural.com
1-800-237-9199
–
PLEASE READ AND SAVE THESE INSTRUCTIONS
WARNINGS:
1. Always unplug or disconnect the air cleaner from power supply before servicing.
2. To reduce the risk of electric shock or injury to persons, do not expose to water or rain, do not use in a
window.
3. Do not use this fan with any solid-state speed control device.
4.
It is highly recommended that a licensed electrician or licensed HVAC contractor install units.
INSTALLING YOUR FLUSH MOUNT AIR CLEANER
EQUIPMENT
The FLUSH MOUNT series of air cleaners are equipped with 2 eye bolts, 2 eye lags and industrial hanging wire.
These units can be plugged in or hard wired. Each unit includes enough filters for approximately one (1) year.
SUSPENDED CEILING INSTALLATION:
(NOTE: A system being installed into a drop ceiling that has joists,
steel girder, or exposed beams above can be hung without eye
lags (see step 4). At least one eye lag will be needed if your system
is being installed into a ceiling that is solid above. (see step 5))
Step 1.
Remove the system from the shipping container. Remove the
adjustable louver door from inside the system. After you have removed
the adjustable louver door, remove the industrial staples and the HEPA
bar and then slip out the HEPA filter. The HEPA filter is a pleated media
surface with a particle board frame. Removing the HEPA filter will make
the system lighter for installation purposes.
Step 2
. On either side of the system there are two mounting holes
where the eye bolts are inserted. It
’
s easiest to screw the eye bolts into
these mounting holes before mounting into the ceiling. If the area above the drop ceiling is tight for space, then
you may need to put the eye bolts in the mounting holes after you have the system into the drop ceiling.
Step 3.
Remove the ceiling tile(s). Depending on your model, the system will fit into either one
2’ x 2’, two 2’ x 2’
or one
2’x 4’
suspended ceiling tiles.
Step 4.
A system being installed into a drop ceiling that has joints, steel girders or exposed beams above can
be hung without the eye lags (see step 5). At least one eye lag will be needed if your system is being installed
into a ceiling that is solid above (see step 6).
Step 5.
Locate either a joist, girder or beam that is directly above the tile where your system will be installed.
After you have located a joist, girder or beam, drape the industrial hanging wire over the apparatus so that either
side is evenly dispersed. Line up the eye bolts with the hanging wire so they are vertical. Thread one end of the
hanging wire through one of the eye bolts, loop the wire and twist tightly together. Thread the opposite end of
the hanging wire through the opposite eye bolt. Pull the wire tight. The system should be only slightly resting on
the grid work of the drop ceiling. After you have adjusted the weight of the system on the grid work, then loop
the wire and twist tightly together.