2
5
6
7
8
9
12
10
11
1
13
14
15
16
17
18
3
4
ASSEMBLY INSTRUCTIONS
To ensure that Jump Mat and Frame Pad
won’t suffer from any excessive tension that
will cause ripping or tearing on the Mat, the
springs must be installed in a specific order.
Follow the Spring order shown for the best
way to properly install and secure the Jump
Mat and Frame Pad to the Top Rails.
Once the first 16 Springs have been
installed on the Top Rail, install the
remaining 20 Springs.
NOTE:
Failure to install the springs to the
correct V-Ring and Top Rail openings and/
or not follow the Spring Order Installation
as shown, may result in tearing or injury
while in use.
STEP 23
23
Model# 9
307TS