Pulsar PSDCSEP-12V4x1A User Manual Download Page 5

 

         It is required to install an installation switch with a nominal current of 6 A in power supply circuits outside 
power supply unit. 
 

1.  Mount the PSU in a selected location and connect the wires.  

2.  Connect power cables (~230 V) to L-N clips of PSU. Connect ground wire to clip marked by earth symbol 

. Use a 

three-core cable (with a yellow and green protection wire) to make connection 

). Lead the cables to the appropriate 

clips through the insulating bushing of the PSU. 

 

 
Shock protection circuit shall be done with a particular care: yellow and green wire coat of power cable 
should be connected to terminal marked with the grounding symbol on PSU enclosure. Operation of PSU 
without the properly made and fully operational shock protection circuit is UNACCEPTABLE! It can cause 
damage to equipment or an electric shock.

  

 

 

3.  Switch on 230 V supply. LEDs on power supply PCB should be ON.  
4.  Check output voltage and adjust if necessary using right potentiometer. 
5.  Disconnect  the  PSU  from  the  mains  and  make  the  rest  of  the  connections  -  connect  wires  to  the 

AUX1...AUX4

 

connectors

.

  

6.  Once the tests and control operation have been completed, close the enclosure/cabinet. 

 

3.  Operating status indication. 

 

The power supply unit features LED status indication. Presence of voltage at each output of the PSU is indicated by the 

green  LED  nearby  each  outputs  fuse.  Failure  (fuse  damage)  is  indicated  by  shutting  down  green  LED  nearby  appropriate 
outputs fuse on the PSU module. 

   
4.  Operation and use.

 

 

4.1. Overload or short circuit of the PSU module output. 

The 

AUX1÷AUX4

 PSU outputs are protected against short circuit by glass fuses. Activation of the protection (glass fuse 

blowing)  is  indicated  by  shutting  down  green  LED  nearby  appropriate  outputs  fuse  on  the  PSU  module.  In  case  of  damage, 
replace the fuse (compatible with the original).  

 

4.2. Operation of the PSU OVP system. 

If the OVP system is activated, the output voltage is automatically cut off. Operation is resumed automatically. 
 

5. Maintenance. 

Any  and  all  maintenance  operations  may  be  performed  following  the  disconnection  of  the  PSU  from  the  power 

supply  network.  The  PSU  does  not  require  performing  any  specific  maintenance  measures,  however,  in  the  case  of 
significant dust rate, its interior is recommended to be cleaned with compressed air.  

 

 

WEEE MARK 

According to the EU WEE Directive – It is required not to dispose of electric or electronic waste as 

unsorted municipal waste and to collect such WEEE separately

 

 

Pulsar sp. j. 

Siedlec 150, 32-744 Łapczyca, Poland 

Tel. (+48) 14-610-19-40, Fax. (+48) 14-610-19-50 

e-mail

[email protected]

[email protected]

 

http:// 

www.pulsar.pl

www.zasilacze.pl

 

 

 

Reviews: