Pulsar PSBS 2512B Manual Download Page 3

www.pulsar.pl   

 

 

 

PSBS2512B 

 

 

 

 

 
 

 

1.2 Block diagram (fig.1)

 

 

1.3. Description of elements and connection links of the PSU. 

Table 1.  Parts of the power supply - pcb (refer to chart 2). 

Part no. 

Description 

[1] 

P

BAT

; pins 

- configuration of UVP battery protection function 

 

P

BAT

 = 

 protection (disconnection) of the battery off 

 

P

BAT

 = 

  protection (disconnection) of the battery on 

 

T

AC

; pins J1, J2 

- configuration of time lag of AC failure indication  

 

J1= 

, J2= 

  time lag T= 5s 

 

J1= 

, J2= 

  time lag T= 140s 

 

J1= 

, J2= 

  time lag T= 1040s (17m 20s) 

 

J1= 

, J2= 

  time lag T= 2h 20m 30s 

Legend: 

  

jumper installed 

  jumper removed

 

[2] 

START

 button (launching from battery) 

[3] 

V

ADJ

 potentiometer, voltage adjustment DC 

[4] 

F

BAT

 

fuse in the battery circuit 

[5] 

Connectors: 
+BAT- 

DC supply output of the battery 

(+BAT= red, -BAT=black) 

+AUX-

 DC supply output 

 (+AUX= +U, -AUX=GND) 

FAC

 - AC absence technical output – relay assisted 

Caution! In Fig.2. the set of contacts indicates potential-free status which corresponds to  
AC power failure. 

[6] 

LED indication: 
AC 

- LED for AC voltage

  

LB 

- LED for battery charging

  

AUX 

- LED for DC voltage 

[7] 

Connector to the external LED indicators: AC and AUX.

 

[8] 

I

BAT

pins 

– battery charging current selection

 

 

I

BAT

 = 

,  Ibat =0,2 A 

 

I

BAT

 = 

,  Ibat =0,5 A 

Legend: 

  

jumper installed 

  jumper removed

 

Fig.1. Block diagram of the power-supply unit. 

 

Summary of Contents for PSBS 2512B

Page 1: ...PSBS 2512B v 1 0 PSBS 13 8V 2A 7Ah Buffer switch mode power supply unit EN Edition 2 from 16 09 2013 Supercedes the edition 1 from 17 11 2011...

Page 2: ...escription 1 1 General description The buffer PSU is used for an uninterrupted supply to alarm systems devices requiring stabilized voltage of 12V DC 15 The PSU provides voltage of 13 8 V DC Current e...

Page 3: ...nd jumper installed jumper removed 2 START button launching from battery 3 VADJ potentiometer voltage adjustment DC 4 FBAT fuse in the battery circuit 5 Connectors BAT DC supply output of the battery...

Page 4: ...Part no Description 1 Isolation transformer 2 Power upply unit board tab 1 fig 2 3 TAMPER microswitches contacts for sabotage protection NC 4 FMAIN fuse in the power supply circuit 230V AC 5 L N conn...

Page 5: ...case of a failure fuse element replacement required Excessive discharge protection UVP U 10 0 V 5 disconnection of BAT battery configuration by the PBAT jumper Technical outputs FAC indicates AC powe...

Page 6: ...Connect the ground wire to the clip marked by the earth symbol PE Use a three core cable with a yellow and green PE protection wire to make the connection Lead the cables to the appropriate clips thr...

Page 7: ...n the output indicate the door status unit closed NC unit opened NO 4 Operation and use 4 1 Overloads or short circuits The AUX output of the PSU is equipped with the PTC polymer fuse protection If th...

Page 8: ...ies to carry out the repairs or if the equipment has been conditionally accepted due to the breaking warranty terms by the claimant 7 All the services rendered by force of the warranty are carried out...

Reviews: