RED LED: 

 

on – the PSU is supplied with 230V AC  

 

off – no 230V AC supply  

 

GREEN LED: 

 

on – DC voltage in the AUX output of the PSU 

 

off – no DC voltage in the AUX output of the PSU 

 

 

The shock protection circuit shall be performed with a particular care, i.e. the yellow and 
green wire coat of the power cable shall stick to one side of the terminal - marked with  

 symbol on the PSU enclosure. Operation of the PSU without the properly made and 

fully  operational  shock  protection  circuit  is  UNACCEPTABLE!  It  can  cause  a  device 
failure or an electric shock. 

 
4. Connect the receivers’ cables to the terminals 

V+ (+), V-(-) 

of the PSU module.  

5. Connect the power (~230V) 
6. Connect the battery (mind the colours):   
- battery output (+V):  BAT+ cable / red, 
- battery output (0V):  BAT – cable / GND / black. 
7. Check the PSU operation indicator: green LED. 
8. Check the PSU output voltage: 
- the PSU voltage without load should amount to U=27,6V DC.   
9. After installing and checking proper working, the enclosure can be closed. 
 
3. Operating status indication. 

 
3.1 LED indication of operating status. 
The PSU is equipped with two diodes on the front panel: 
 
 
 

 

 
 

 
4. Operation and use. 

 
4.1 Overload or short circuit of the PSU output (SCP on) 
In case of overload, the output voltage is automatically shut off, and so is the LED indicator. The restoration 

of the voltage takes place immediately after the failure (overload) is over. 

 
4.2 Disconnection of discharged battery. 

The PSU is equipped with the discharged battery disconnection system. During the battery-assisted operation, 

reducing voltage below 19V at the battery terminals will cause battery disconnection. 

 

4.3 Maintenance. 

Any and all maintenance operations may be performed following the disconnection of the PSU from the 

power supply network. The PSU   does not require performing any specific maintenance measures, however, in 
case of significant dust rate, its interior is recommended to be cleaned with compressed air. In case of fuse 
replacement, use a replacement of the same parameters. 
 

 

 
 
 
 
 
 
 
 
 
 

Summary of Contents for HPSB 5524C

Page 1: ...HPSB 5524C v 1 0 HPSB 27 6V 5A 2x17Ah Buffer switch mode power supply unit EN Edition 2 from 18 09 2012 Supersedes edition 1 from 21 11 2011 ...

Page 2: ...bilised voltage of 24 V DC 15 The PSU provides voltage of U 27 6 V DC Current efficiency 1 Output current 5A 0 5A battery charge 2 Output current 3 5A 2A battery charge Total device current battery 5 5A max In case of power decay a battery back up is activated immediately The PSU is constructed based on the switch mode PSU with high energy efficiency The PSU is housed in a metal enclosure colour R...

Page 3: ...nts and connectors tab 1 tab 2 fig 2 Element no Fig 2 Description 1 PSU module 2 connectors see tab 2 3 green LED indicates AC power 4 potentiometer output voltage adjustment 5 BAT GND battery outputs BAT red GND black 6 TAMPER contact of sabotage protection NC 7 Additional connector for LED indication 8 Selection jumper for charging current Ibat 0 5A Ibat 2A Legend jumper installed jumper removed...

Page 4: ...4 Fig 2 The view of the PSU ...

Page 5: ...cation AC diode indicating AC power status AUX diode indicating DC power status at the PSU output red normal status on failure off green normal status on failure off Technical outputs TAMPER indicates enclosure opening microswitch NC contacts enclosure closed 0 5A 50V DC max Mechanical parameters tab 4 Enclosure dimensions 405 x 355 x 90 8 400 x 350 x 90 WxHxD Fixation see figure 2 Fitting battery...

Page 6: ... convectional air flow through ventilating holes of the enclosure Before installation prepare a PSU load balance 1 Output current 5A 0 5A battery charge 2 Output current 3 5A 2A battery charge Total device current battery 5 5A max As the PSU is designed for a continuous operation and is not equipped with a power switch therefore an appropriate overload protection shall be guaranteed in the power s...

Page 7: ...DC 9 After installing and checking proper working the enclosure can be closed 3 Operating status indication 3 1 LED indication of operating status The PSU is equipped with two diodes on the front panel 4 Operation and use 4 1 Overload or short circuit of the PSU output SCP on In case of overload the output voltage is automatically shut off and so is the LED indicator The restoration of the voltage...

Page 8: ...ty repairs at the earliest convenienve however not later that within 14 days from the delivery to the service centre of the manufacturer 7 The repair period mentioned in item 6 may be prolonged if there are no technical possibilities to carry out the repairs or if the equipment has been conditionally accepted due to the breaking warranty terms by the claimant 8 All the services rendered by force o...

Reviews: