background image

 

1. Destination: 

EN 

 

The 

AWO 306

 metal casings 

compliant with EN50131 GRADE3

 are designed as components (supplying) in 

intruders alarms, access control systems, security systems etc. There are intended for installation: 

 

control panel optional with supplementary modules 

 

access control controllers with optional modules  

 

radio or GSM transmitter with optional module PSU 

 

other dedicated devices, components etc. 

 

2. Installation:  

 

 
The metal casing (+PCB) must be installed by a qualified installer, holding the relevant certificates, required and 

necessary in the particular country for connecting (interfering with) the 230V AC systems and low-voltage installations.  

Because the transformer is designed for the continuous operation and is not equipped with ON/OFF switch, the 

power supply line should have the appropriate overload protection. The user should be informed how to disconnect the 

unit from the mains (the most often by separate and mark the adequate fuse in the fuse box). The power supply 
installation should be conform to the applicable standards and law.  

The casing (+PCB) should be installed indoors, where the air humidity is normal (RH=90% max. without 

condensation) and temperature in the range of -10°C to +40°C. 

 

 

Caution!      Prior to entering for installation it is necessary to make sure if the voltage 

in the 230 V/AC circuit is disconnected. 

All service works inside the housing must be carried out with 230V/AC supply voltage 

disconnected. 

 

 
1. Mount the PCB (control panel, etc) with dedicated holes (use distance pins, bracket screw). 

2. Install metal casing in dedicated place and bring in the connecting (~230V) and signal conductors through cables 
bushings. 

Remarks: 

supply circuit ~230V should be carried out with three-core cable  

(with yellow-green protective PE conductor). 

3. Supply conductors ~230V should be connected to 

230V / AC L-N

 terminals of the transformers. 

Protective conductor should be connected to the terminal marked with grounding symbol.   

 

                  

                    Caution!      Operating the power supply without properly made and technically 

      operational electric shock protection circuit is IMPERMISSIBLE! 

        This creates hazard of equipment damage and risk of electric shock. 

 

 

 
4. Connect the output of transformer to the terminals (~AC) on the PCB, using installed cables 

Remarks: 

connect required voltage U1 or U2 or U3 (secondary voltage) for the correct device. 

5. If necessary, make other connections required for the correct type of system / device. 

Remarks: 

consistent with requirements and recommendation of the producer. 

6.

  Start the system (switch on ~230V, battery), adjust or configure: according to procedure of the 

producer’s system. 

7. After installing and checking the proper operation of the system, close the casing. 
 
 

 
 

 
 

 
 
 

 
 
 
 
 