background image

 

1. Destination: 

EN 

 

The 

AWO 270

 metal casings 

compliant with EN50131 GRADE3

 are designed as components (supplying) in 

intruders alarms, access control systems, security systems etc. There are intended for installation: 

 

control panel optional with supplementary modules 

 

access control controllers with optional modules  

 

radio or GSM transmitter with optional module PSU 

 

other dedicated devices, components etc. 

 

2. Installation:  

 

 
The metal casing (+PCB) must be installed by a qualified installer, holding the relevant certificates, required and 

necessary in the particular country for connecting (interfering with) the ~230 V systems and low-voltage installations.  

Because the transformer is designed for the continuous operation and is not equipped with ON/OFF switch, the 

power supply line should have the appropriate overload protection. The user should be informed how to disconnect the 

unit from the mains (the most often by separate and mark the adequate fuse in the fuse box). The power supply 
installation should be conform to the applicable standards and law.  

The casing (+PCB) should be installed indoors, where the air humidity is normal (RH=90% max. without 

condensation) and temperature in the range of -10°C to +40°C. 

 

 

 

Caution!      Prior to entering for installation it is necessary to make sure if the voltage 

in the ~230 V circuit is disconnected. 

All service works inside the housing must be carried out with ~230 V supply voltage 

disconnected. 

 

 

1. Mount the PCB (control panel, etc) with dedicated holes (use distance pins, bracket screw). 
2. Install metal casing in dedicated place and bring in the connecting (~230 V) and signal conductors through cables 

bushings. 

Remarks: 

supply circuit ~230 V should be carried out with three-core cable  

(with yellow-green protective PE conductor). 

3. Supply conductors ~230 V should be connected to 

~230 V L-N

 terminals of the transformers. 

Protective conductor should be connected to the terminal marked with grounding symbol.   

 

                  
                    Caution!      Operating the power supply without properly made and technically 

      operational electric shock protection circuit is IMPERMISSIBLE! 

        This creates hazard of equipment damage and risk of electric shock. 

 

 

 

4. Connect the output of transformer to the terminals (~AC) on the PCB, using installed cables 

Remarks: 

connect required voltage U1 or U2 (secondary voltage) for the correct device. 

5. If necessary, make other connections required for the correct type of system / device. 

Remarks: 

consistent with requirements and recommendation of the producer. 

6.

  Start the system (switch on ~230 V, battery), adjust or configure: according to procedure of the 

producer’s system. 

7. After installing and checking the proper operation of the system, close the casing. 
 

 
 

 
 

 
 
 

 
 
 
 

Summary of Contents for 17/TRZ75/SATEL/GRADE3

Page 1: ...a PCB powinna być montowana w pomieszczeniach zamkniętych o normalnej wilgotności powietrza RH 90 maks bez kondensacji i temperaturze z zakresu 10 C do 40 C Przed przystąpieniem do instalacji należy upewnić się że napięcie w obwodzie zasilającym 230 V jest odłączone Wszelkie prace serwisowe wewnątrz obudowy należy wykonywać przy odłączonym zasilaniu 230 V 1 Zamontować w obudowie PCB w odpowiednich...

Page 2: ...for installation it is necessary to make sure if the voltage in the 230 V circuit is disconnected All service works inside the housing must be carried out with 230 V supply voltage disconnected 1 Mount the PCB control panel etc with dedicated holes use distance pins bracket screw 2 Install metal casing in dedicated place and bring in the connecting 230 V and signal conductors through cables bushin...

Page 3: ...ical data of transformer TRZ 75 20 NAZWA NAME C S U I U1 I1 F t TRZ 75 20 IP43 75VA 230 V 0 40 A 20 V 3 75 A T 630 mA 250 V 130o C C Obudowa transformatora Transformer casing S Moc Power rating U Napięcie zasilania Supply voltage I Prąd pobierany przy nominalnym obciążeniu z sieci 230 V Current draw at nominal load from network 230 V U1 Napięcia wtórne Secondary voltage I1 Nominalny prąd wyjściowy...

Page 4: ...wych i detalicznych tego sprzętu oraz gminne jednostki organizacyjne prowadzące działalność w zakresie odbierania odpadów Prawidłowa realizacja tych obowiązków ma znaczenie zwłaszcza w przypadku gdy w zużytym sprzęcie znajdują się składniki niebezpieczne które mają negatywny wpływ na środowisko i zdrowie ludzi WEEE MARK The waste electric and electronic products do not mix with general household w...

Reviews: