4.

 

Optional: Turn the Polymer Tank Mixer switch, marked “MIXER” to the “AUTO” position. 

5.

 

Optional: Select the Mixer Cycle desired: 

 

6.

 

Turn the Main Power switch, marked “POWER” to the “ON” position; the unit will begin to 
function automatically. 

 

Polymer Makedown Process 

o

 

Process Start  

ƒ

 

This is a polymer makedown system utilizes a batch process sequence. The makedown 
process is triggered to start when the high level switch in the storage tank is open, and the 
low level switch in the tank changes from closed to open, indicating that the level in the 
tank has just dropped below the low level.  

o

 

Polymer Makedown for Tank Fill 

ƒ

 

When triggered to start the controller will energize the Water Inlet Solenoid Valve to open, 
allowing municipal water to flow into the system. This flow is verified by the condition of 
the Flow Switch changing from Open to Closed contact. At the same time the Neat Polymer 
Pump is energized to pump neat polymer into the water flow where it is ‘made-down’ into a 
polymer solution and stored in the storage tank. This process continues until the High Level 
switch is closed, leading to the process flush cycle. 

ƒ

 

 Flow Switch Interrupt – When the Water Inlet Solenoid Valve is open, the Flow Switch 
status should show Closed to verify water flow in the system, and otherwise show Open 
indication that water flow has terminated. There are two alarm conditions that will be 
triggered by the Flow Switch, causing the Red ‘Flow Alarm’ light to illuminate and power 
supply to be removed from the Water Inlet Solenoid Valve and the Neat Polymer Pump 
until reset by the Flow Switch condition returning to that expected, or by removing power 
from the PLC allowing this alarm to reset to off when power resumes. 

1.

 

No Flow Alarm: There is a 5 second delay from the opening of the Water Inlet 
Solenoid Valve to reading the flow switch status for alarm. If the Flow Switch 
contact status is Open (indicating No Flow, or loss of incoming water) the alarm 
condition in will be activated. 

 

1/9 = 1 minute “ON” followed by 9 minutes “OFF” 

 

4/6 = 4 minutes “ON” followed by 6 minutes “OFF” 

 

7/3 = 7 minutes “ON” followed by 3 minutes “OFF” 

 

10/0 = 10 minutes “ON” with no “OFF” time; continuous operation 

Summary of Contents for Automatic Polymer Makedown Systems

Page 1: ...Systems Standard Product Operations 27101 Airport Rd Punta Gorda FL 33982 Tel 941 575 3800 Tel 800 333 6677 Fax 941 575 4085 Fax 800 456 4085 spotech pulsa com www Pulsafeeder com Manufacturers of Qu...

Page 2: ...the factory for inspection and repair All returns require a Return Authorization number to be issued by Pulsafeeder Parts purchased to correct a warranty issue may be credited after an examination of...

Page 3: ...i Table of Contents Topic Page Introduction 4 Safety 5 Skid Layout and Component Descriptions 6 Systems Overview 7 Supply Side 7 Process Side 8 Installation 9 Owner Installed Piping Tubing Electrical...

Page 4: ...he essential elements for successful installation and operation of your system s You are encouraged to READ THIS MANUAL Pulsafeeder Pre Engineered Polymer Makedown Systems are designed to support mult...

Page 5: ...the System disconnect pump s from power supply de pressurize the system and drain chemicals from the lines WARNING Inspect tubing regularly and replace as necessary When inspecting tubing wear protect...

Page 6: ...ank This system can be used for two different chemicals or for redundant pump operation with one chemical Your skid system may be less complex than this Note the various components and their descripti...

Page 7: ...ation Column Flow Indicator Water Static Mixer Made down Polymer Day Tank Back Pressure Valve Water Inlet Left Side Back or Front Mounting Base Made down Polymer Inlet Made down Polymer Outlet to Day...

Page 8: ...is referred to as a flooded suction Because Neat Polymer is a high viscosity fluid the supply should never be located below the centerline of the pump s which is referred to as suction lift Connectio...

Page 9: ...ere the injection point is below the Solution Supply Tank example injection into a well or where the injection point may be at reduced pressure example injection into the suction side of a pump instal...

Page 10: ...with made down polymer Installation area should provide ease of access to skid components and pumps and the area should be kept free of clutter to enable safe operation and maintenance Note that pump...

Page 11: ...nects the Pulsafeeder Polymer Makedown System to your served process Please refer to Figure 1 on page 6 If the injection point is below the dosing chemical source or if injecting into a low pressure a...

Page 12: ...y providing a vent path to the calibration column bypassing the Back Pressure Valve 5 Turn POLY PUMP switch to Hand to start the Neat Polymer Pump 6 Observe polymer flow through the clear braided tubi...

Page 13: ...ump neat polymer into the water flow where it is made down into a polymer solution and stored in the storage tank This process continues until the High Level switch is closed leading to the process fl...

Page 14: ...setting the mixer will run continuously In Auto mode it will follow a timer sequence as selected by the operator from a multi position switch on the control panel For the VFD option the speed adjustm...

Page 15: ...Automatic Polymer Makedown Systems Installation Operation and Maintenance Manual 72 910 APMDS E Rev D Skid Layout and Components Page 15 Electrical Schematic...

Page 16: ...Automatic Polymer Makedown Systems Installation Operation and Maintenance Manual 72 910 APMDS E Rev D Skid Layout and Components Page 16...

Page 17: ...Automatic Polymer Makedown Systems Installation Operation and Maintenance Manual 72 910 APMDS E Rev D Skid Layout and Components Page 17...

Reviews: