
PAGE 9 OF 9
QUESTIONS?
Call 1-800-696-8446, or email [email protected]
c 2021. PTS America, lnc. All rights reserved.
STEP-9
STEP-8
STEP-10
8 x4
13 x4
14 x4
Fully extend drawer rails then
align the rail’s smallest hole to
the drawer slide panel’s holes.
Secure with bolts.
8
H
13
14
x4
Lock p
on 4 corners of the back panel.
lastic wedge bracket