15
OPTION 3
and
OPTION 4
are permitted when installing the MAX CADDY add-on with an existing furnace whose hot
air plenum ducts are downwards flowing. The hot air plenum of the MAX CADDY add-on
must
be above the add-on
and cannot be directed downward.
Do not install connecting ducts in a way that would allow inversion of the air flow (see
example 1 and 3
).
The transfer duct between the existing furnace and the add-on must be at least 540 square inches (0.35 m
2
) and
deviations radius must be at least 6" (152 mm). (See
OPTION 1 and 2
).
Option 1
Option 2
*Minimum duct size 540
square inches (0.35 m
2
)
*R = Minimum radius 6 inches