Prozone PZ4 Installation Manual And Operation Manual Download Page 4

4

P Z 4

               

Above Ground Pool Installation

 

 

 

 

 

 

 

 

 

CAUTION: Make sure the voltage is the same as prescribed on the side of the Prozone ozone generator. Overvoltage will void 

customer warranty. 

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

  Turn pump OFF. 

  Locate section of existing plumbing in which you choose to install the ENTRANCE leg of the bypass. Location should be in any 

accessible area after the pump, but before the filter. 

  Install Saddle Clamp Top & Bottom, (and adapters if needed), without Bushing, (this will be used as a guide for your installation hole).

 

 

  Drill a 7/8” hole through one wall of the pipe, using power drill, being careful not to drill too deep to avoid penetrating the opposite side 

of the plumbing.

Remove the Saddle Clamp Assembly.

Using components listed, mount the Saddle Clamp Assembly on Entrance bypass location with the INLET side of the Venturi Injector

mounted in the Saddle Clamp Bushing, (ozone ports should be facing upward), and tighten both screws.

Place 1½” Polybraid Tubing over the 1½” barb on the OUTLET side of the filter, (remove existing hose if necessary).

Place one end of the 1½” PVC Tee into the 1½” Polybraid hose and the other end into the system tubing which was removed from the

filter. Secure both ends of the 1½” Hose with the large metal hose clamps.

Attach one end of ¾” Clear Hose the Venturi Injector and secure with a metal clamp. Attach other end of the ¾“ Clear Hose to the

¾” barb on the PVC Tee and secure with a metal clamp.

Cut a 6” length of ¼” Polybraid Hose and connect one end to the open ozone port (Marked #1) on the Venturi Injector and the other

end to the OUTLET side of the Check Valve, (Make sure you can blow air through the Check Valve towards the Injector port). Secure

both ends with black plastic clamps.

Connect the remaining section of ¼” Polybraid Hose to the INLET side of the Check Valve and the other end to the barb on top of

the PZ4 Ozone Generator. Secure both ends with black plastic clamps.

Install the PZ4 Ozone Generator on base of pump pack using the metal screws and washers.

Connect the PZ4 Ozone Generator system to the circulation pump or timer. The Prozone system and the circulation pump should

start simultaneously. Use N.E.C. or local code grounding and installation procedures for swimming pool equipment.  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

7/8” Hole Saw

INSTALLATION ASSEMBLY USING

P24 STANDARD ABOVE GROUND KIT

Pump

PZ4

Filter

Saddle Clamp

Assembly

¾” Hose

Check Valve

¼” Hose

¼” Hose

Injector

Clamp

Clamp

Air

Flow

Water Flow

Flow

1½” Hose

1½” x 1½” x ¾”

Hose Barb Tee

Clamps

Reviews: