Above Ground Pool Installation
CAUTION: Make sure the voltage is the same as prescribed on the side of the Prozone ozone generator. Overvoltage will void
customer warranty.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
Turn pump OFF.
Locate section of existing plumbing in which you choose to install the ENTRANCE leg of the bypass. Location should be in any
accessible area after the pump, but before the filter.
Install Saddle Clamp Top & Bottom, (and adapters if needed), without Bushing, (this will be used as a guide for your installation hole).
Drill a 7/8” hole through one wall of the pipe, using power drill, being careful not to drill too deep to avoid penetrating the opposite side
of the plumbing.
Remove the Saddle Clamp Assembly.
Using components listed, mount the Saddle Clamp Assembly on Entrance bypass location with the INLET side of the Venturi Injector
mounted in the Saddle Clamp Bushing, (ozone ports should be facing upward), and tighten both screws.
Place 1½” Polybraid Tubing over the 1½” barb on the OUTLET side of the filter, (remove existing hose if necessary).
Place one end of the 1½” PVC Tee into the 1½” Polybraid hose and the other end into the system tubing which was removed from the
filter. Secure both ends of the 1½” Hose with the large metal hose clamps.
Attach one end of ¾” Clear Hose the Venturi Injector and secure with a metal clamp. Attach other end of the ¾“ Clear Hose to the
¾” barb on the PVC Tee and secure with a metal clamp.
Cut a 6” length of ¼” Polybraid Hose and connect one end to the open ozone port (Marked #1) on the Venturi Injector and the other
end to the OUTLET side of the Check Valve, (Make sure you can blow air through the Check Valve towards the Injector port). Secure
both ends with black plastic clamps.
Connect the remaining section of ¼” Polybraid Hose to the INLET side of the Check Valve and the other end to the barb on top of
the PZ4 Ozone Generator. Secure both ends with black plastic clamps.
Install the PZ4 Ozone Generator on base of pump pack using the metal screws and washers.
Connect the PZ4 Ozone Generator system to the circulation pump or timer. The Prozone system and the circulation pump should
start simultaneously. Use N.E.C. or local code grounding and installation procedures for swimming pool equipment.
7/8” Hole Saw
INSTALLATION ASSEMBLY USING
P24 STANDARD ABOVE GROUND KIT
Pump
PZ4
Filter
Saddle Clamp
Assembly
¾” Hose
Check Valve
¼” Hose
¼” Hose
Injector
Clamp
Clamp
Air
Flow
Water Flow
Flow
1½” Hose
1½” x 1½” x ¾”
Hose Barb Tee
Clamps