background image

Put the basebox upright and connect it to the 
net with the power cord. Place the actuator in 
the highest position by using the lift control.

1

2

Assembly instructions

Put the chassis and basebox upside down.
Assemble the adjustable pillars to the chassis 
(4 M6x20 bolts per pillar).

4 x M6x20

4 x M6x20

4 mm

Push the hinge pins, from the outsides, partially 
in the hinges. Please note: the serrated edge of 
the pins must be on the outside. Subsequently, 
place the VESA bracket into the hinges.

3

3 mm

Push the hinge pins carefully through, then 
completely hammer them by using a pin punch.

4

1 x pin

1 x pin

4

Reviews: