Proton HD P1-E-7015 Operation Manual Download Page 4

2. SAFETY PRECAUTIONS

55

Thermal  protection  of  fan  motor  is  built-in  and  works  in  a 

standalone mode.

Current network which feeds the curtain’s motor and controls 

must  be  additionally  protected  by  a  fuse  to  prevent 

consequences of shunt fault.

To  prevent  defrosting  of  the  industrial  curtain’s  heat 

exchanger  when  circulation  of  the  heat  medium  is  stopped 

during  a  heating  period  under  outdoor  temperatures  lower 

than  0°C,  you  need  to  drain  the  heat  medium  from  the  heat 

exchanger and blow it off by compressed air.

Check  compliance  of  parameters  of  the  electrical  supply 

network  indicated  on  the  industrial  curtain’s  rating  plate 

before connecting to the power supply.

Check  grounding.  Prohibit  the  use  of  the  equipment  without 

grounding  as  it  may  cause  property  damages,  personnel 

injuries and death.

Check correctness of wiring of the system, accordance of the 

heat  medium  parameters  with  the  parameters  indicated  on 

the rating plate as well as leak proof of joints before filling in 

the heat medium.

During  installation,  start-up,  repair  and  maintenance  of  the 

industrial curtain follow the safety rules.

Use  screws  appropriate  for  the  material  which  the  base  is 

made of.

While  unit  operating  under  low  temperatures,  the  user  must 

provide  protection  of  the  water  heat  exchanger  or  use  heat 

medium with special additives preventing copper corrosion.

-t

Avoid substances and impurities in the heat medium causing 

copper corrosion.

Install the industrial curtain on a firm base or surface, which 

can stand its weight filled with water.

4

Before any actions connected with the air curtains, please, study

this manual to provide safety.

Installation and connection of the equipment to pipelines and 

networks  must  be  performed  by  qualified  personnel  only, 

having appropriate access.

Summary of Contents for HD P1-E-7015

Page 1: ...FOR INDUSTRIAL CURTAINS PROTON HEAT DOOR P1 Safety precautions Technical parameters Installation Construction and dimensions www protongroup org 05010416 RU EN Water heating Electric heating Without...

Page 2: ...1 Introduction 2 Safety precautions 3 General information 8 Connection of heat medium 3 4 5 4 Dimensions 6 5 Construction 7 6 Technical characteristics 8 10 11 7 Installation 9 Control elements 12 10...

Page 3: ...The manufacturer preserves the right to alter the construction which doesn t impact its functioning and basic technical parameters The industrial curtain is intended only and exclusively to be instal...

Page 4: ...ries and death Check correctness of wiring of the system accordance of the heat medium parameters with the parameters indicated on the rating plate as well as leak proof of joints before filling in th...

Page 5: ...hot water as a heat medium They are very efficient and powerful save money and require low overhead and operating costs Heating curtains with water heating These air curtains apply electric heating el...

Page 6: ...4 DIMENSIONS 6 Dimensions of industrial curtain PROTON HEAT DOOR P1 Dimensions of a mounting console M HD 560 590 100 2000 560 590 100 1500 462 13 2 160 150 344 13 2 12 50 13 2...

Page 7: ...ating elements The frame for mounting is made of galvanized steel Joint boxes are equipped with clamping cables Thermal sensors of overheat protection of the finned tubular electric heaters are fasten...

Page 8: ...dustrial curtain heat power of the industrial curtain air consumption P p Qp P z water temperature at the inlet of the industrial curtain water temperature at the outlet of the industrial curtain wate...

Page 9: ...ROTON HD P1 F 70 General parameters General parameters 18 0 8000 7 0 68 7 0 54 840 400 50 28 0 68 8 24 0 11000 6 5 70 7 0 54 1260 400 50 37 0 73 2 7 0 230 50 54 840 4 0 68 8500 51 1 7 0 230 50 54 1260...

Page 10: ...les of 1 5 and 2 m that allows to cover the length of doorway The curtains are to be fixed on mounting consoles Horizontal installation Vertical installation up to 7 m up to 14 m up to 7 m up to 9 m P...

Page 11: ...the following conditions The air curtain has to be completed with intercepting cocks on the inlet and outlet pipes 1 It is recommended to install a coarse filter on the inlet pipe and air outtake on t...

Page 12: ...lar electric heaters motors alarm protection are installed The control board RDE is placed in plastic casing with IP65 protection and has a transparent door with additional gasket for manual control Y...

Page 13: ...urtain without heating to control board RDU 1 2 Tz 1 X1 2 1 5 2 Indicators to the scheme Notes 1 2 joint box of the curtain control board RDU The section is indicated for cables with cooper cores and...

Page 14: ...ontacts of a group of electric heaters 10 WIRING CONTROL ELEMENTS 10 2 Wiring of industrial curtain with electric heating to control board RDE PE PE Contacts of groups of the overheat sensors Indicato...

Page 15: ...5 59 4 75 9 95 7 118 8 145 2 171 6 11 6 15 1 19 8 25 7 36 3 46 2 56 1 72 6 92 4 112 2 132 0 4 4 6 1 7 9 13 2 18 7 29 7 50 6 36 3 22 0 44 0 11 0 19 0 27 0 38 0 46 0 70 0 85 0 115 0 135 0 175 0 215 0 2...

Page 16: ...s heat output Data is presented as a reference For calculations for actual projects address to specialists kW Water consumption Inside diameter Type 15 kW 23 kW 39 kW 61 kW 96 kW 180 kW 20 mm 25 mm 3...

Page 17: ...17 FOR NOTES...

Page 18: ...18 FOR NOTES...

Page 19: ...19 FOR NOTES...

Page 20: ...vice proton kiev ua www protongroup org www protongroup org In case of any failures in operation of equipment address the authorized support centers of the Manufacturer For information about support c...

Reviews: