Safety valve discharge
WARNING
: It must not discharge above an entrance or window or any type of public access area.
Connect the safety valve discharge pipe to the valve, the discharge must be extended using not less than 15 mm
o.d. pipe, to discharge in a visible position outside the building, facing downward, preferably over a drain. The pipe
must have a continuous fall and be routed to a position so that any discharge of water, possibly boiling or steam,
cannot create any danger to persons, damage to property or external electrical components and wiring. Tighten all
pipe connection joints.
Gas connection
The supply from the governed meter must be of adequate size to provide a constant inlet working pressure of
20 mbar for Natural gas (28 – 30 mbar for Butane or 37 mbar for Propane).
To avoid low pressure problems, it is recommended that the supply is taken to the boiler using 22 mm pipe as far
as possible.
On completion, the gas installation must be tested using the pressure drop method and purged in accordance with
the current issue of BS6891.
Gas Safety (Installation and Use) Regulations
In your interests and that of gas safety, it is the law that
ALL
gas appliances are installed and serviced by
a competent person in accordance with the above regulations.
Statutory requirements
The installation of this boiler must be carried out by a competent person in accordance with the relevant require-
ments of the current issue of:
The Gas Safety (Installation and Use) Regulations
The Building Regulations
The local water company Bylaws
The Building Standards Regulations (Scotland)
The Health and Safety at Work Act
Sheet metal parts
WARNING:
When installing or servicing this boiler, care should be taken when handling the edges of sheet metal
parts to avoid the possibility of personal injury.
Installing the boiler
Prior to installing the boiler, the system must be thoroughly flushed to eliminate any foreign bodies and contami-
nents such as filings, solder, particles, oil, grease etc.
Note:
Solvent products could cause damage to the system.
BOILER INSTALLATION
To install the boiler, proceed as follows:
•
Allowing sufficient clearances for servicing/repair, place the template on the wall (see diagram 7).
Note:
The boiler can be installed only on the closed wall.
•
Determine the position of the flue hole and drill hole for flue, preferably using a 120 mm core drill.
•
Drill two
10 mm
holes for the wallplugs supplied.
•
Screw fixing screws supplied into wallplugs, leave proud by approx. 10 mm.
Note:
Boiler fixing holes are keyhole type slots at the top of the boiler to allow easy hanging of boiler.
•
Remove template.
•
Hang the boiler on the screws and tighten screws.
Note:
As a option the hanging bracket can be used. Two screws are sufficient for fixing of the hanging bracket.
Hanging bracket fixing screws have to be fully tight before the boiler is hung on.
Pipework connections
•
Remove plastic caps from boiler connections.
•
Connect the central heating pipework connections and isolating cocks as shown on diagram 6.
•
Connect the domestic cold water inlet connection and isolating cock.
•
Connect the hot water outlet connection.
•
Connect the safety valve discharge pipe.
•
Finally, connect the gas connection and isolating cock.
Summary of Contents for 100EC
Page 2: ...Supplied By www heating spares co Tel 0161 620 6677...
Page 19: ...Supplied By www heating spares co Tel 0161 620 6677 17 100EC FLUE CONFIGURATIONS Diagram 1 1...
Page 31: ...Supplied By www heating spares co Tel 0161 620 6677 29 100EC...
Page 32: ...Supplied By www heating spares co Tel 0161 620 6677 26 January 2001...