background image

USE AND INSTALLATION MANUAL 

0001268 edition: 1/22.03.2021 

Page 

of 

 

 

 
 

7.  TABLE NO. 1 - POSSIBLE INSTALLATION OF DEVICE RUP503-U 

DEVICE

 

UNIVERSAL HOLDER

 

TRIPOD TM6 / TM6-T / TM12 / TM12-2 / TM13 / TM13-T / 

TM14 / TM15

 

UTB (AT017-300)

 

 

 

 
 

 

8.  GENERAL DIMENSIONS 

 

Figure 3 – Overall dimensions of device 

 

 

Summary of Contents for RUP503-U

Page 1: ...ear ratio 7 2 1 Lever length 300mm Rope diameter 6 3mm Weight 25m rope 22 5kg 35m rope 24 0kg 45m rope 25 5kg 50m rope 26 2kg The device RUP503 U is formed by a general winch with reel on which work rope of 6 3mm in diameter is wound The device is fitted with holder UTB AT017 330 b for spring type energy absorber SDW with connectors AZ011 c detachable part of crank for transportation of the device...

Page 2: ...dry naturally and keep it away from any sources of heat In metallic products slightly lubricate some mechanical parts springs hinges pawls etc on a regular basis to ensure their better operation The device should be stored loosely packed in well ventilated rooms protected from direct light UV degradation dust sharp edges extreme temperatures and aggressive chemical substances 5 TIME OF USAGE Maxim...

Page 3: ...8 edition 1 22 03 2021 Page 3 of 8 7 TABLE NO 1 POSSIBLE INSTALLATION OF DEVICE RUP503 U DEVICE UNIVERSAL HOLDER TRIPOD TM6 TM6 T TM12 TM12 2 TM13 TM13 T TM14 TM15 UTB AT017 300 8 GENERAL DIMENSIONS Figure 3 Overall dimensions of device ...

Page 4: ...uction manual i Marking of manufacturer or distributor of the device j Maximum number of simultaneous users Figure 6 Next inspection sticker Next inspection sticker should be affixed near identity label and it is necessary to mark month and year of the next periodic inspection Do not use the device after this date Attention Before the first use mark the date of next inspection date of first use 12...

Page 5: ... INSTALLING RUP503 U a Install the device in socket of the universal holder and secure with automatic pin b When using the device for evacuation of personnel in accordance with EN 1496 2017 B additionally use energy absorber SDW mounted using AZ011 at the end of work rope ...

Page 6: ...ices pay particular attention to in full body harnesses and work positioning devices buckles regulating elements attachment points buckles webbings seams belt loops in energy absorbers attachment loops webbings seams housing connectors in lanyards and textile guides rope loops thimbles connectors regulating parts splices in lanyards and steel guides rope wires clamps loops thimbles connectors regu...

Page 7: ...d The warranty covers Defects in material Defects in workmanship Anti corrosion coating defects According to EN 365 personal protective equipment against falls from a height shall be subject to periodic inspections carried out at least every 12 months Periodic inspection shall be carried out by the manufacturer s authorized service point located at the following address PROTEKT Grzegorz Łaszkiewic...

Page 8: ...ith EN365 Reference number of device RUP503 U Serial number Date of first use installation Date of manufacture Place of installation User name Inspection and repair record No Date of inspection Type of inspection repair Remarks Date of next inspection Name and signature of service technician 1 2 3 4 5 6 7 8 9 10 ...

Reviews: