![Protective Enclosures Company TV Shield Pro 2015 Owner'S Manual Download Page 7](http://html.mh-extra.com/html/protective-enclosures-company/tv-shield-pro-2015/tv-shield-pro-2015_owners-manual_1619896007.webp)
7
STEP 3:
Base Plate Installation
A) Wall or Ceiling Mount Installation (Recommended)
1. Lay the base plate (B) face down on a soft flat surface. Place your wall mount brackets or
wall mount rails (from the separately sold wall mount) on the back of the base plate and install
them using the 8mm bolts provided with your separately sold wall/ceiling mount. Do not over
tighten them (see Figure A).
2. Hang the base plate (B) with the mount brackets on the already installed separately sold
mount per separate mount instructions just like you would a TV.
B) Flush Mount Installation
Note: The TV Shield PRO is intended to be mounted using a standard VESA wall, ceiling or floor mount.
You can flush mount the enclosures directly to a wall but it does require professional installation and
drilling (the hardware for this is not provided). You are provided (4) 1” x 0.90” Nylon Spacers for flush
mount applications. Please note that a 1/2” diameter is the max Lag Bolt size able to be used with the
provided spacers.
1. Drill holes in the base plate (B) at the desired mounting locations (based on your
application). Drill the hole size according to your Lag Bolt diameter but no bigger than 1/2”
(see Figure B).
2. Run the Lag Bolts through the inside of the base plate (B) and through the provided 1” x
0.90” Nylon Spacers (H) on the back of the base plate (B) between the wall and the base plate
to ensure you are not resting on the vent and cable pass-through hoods (see Figure B).
Note: Be sure to use a grommet, bonded washer or silicone sealant to ensure all drilled holes are water
tight (see Figure B).
Recommended
Drilling
Locations
Figure A
Figure A
STEP 1:
Remove Front Frame from Base Plate
*Read all of the assembly notes, caution notices and important information prior to starting
the installation.
1. Use the supplied key to unlock the unit. Open the front frame (A) perpendicular
to the base plate (B) and shift it right to remove the front frame from the base plate
and set it aside (see Figure A).
STEP 2:
Install Power and Component Cables
* Skip section A and continue to section B if you are performing a flush mount installation.
1. Remove the cable pass-through hood using a 5/16” wrench (see Figure A).
2. Pass all power, HDMI, coaxial cables and any other component cables though
the cable pass-through. Ensure you have enough length on your cables inside of
the enclosure to plug them into your TV inputs. Space all of the cables at least
3/4” apart from each other to ensure that the unit seals properly. Make sure not
to bunch the cables (see Figure B).
3. Reinstall the cable pass-through hood (see Figure A).
Cable Pass-
Through Hood
Figure B
IMPORTANT:
• The maximum load capacity of the internal mount is 150lbs
• Do not remove the protective coverings from the front shield of the enclosure until you are instructed to do so in the
correct step to avoid any scratches while installing
Shift the Front Frame
to Remove it
from the Base Plate
Cables at Least
3/4” Apart
Figure A
Figure B
Recommended
Drilling Locations
Use Nylon
Spacers
and Grommet,
Bonded Washer,
or Silicone
Mount Brackets
from Your
Separately
Sold
Mount