background image

K422 ASSEMBLY AND FITTING INSTRUCTIONS 

Page 

3

 of 

4

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Slide clamp through opening in the leg 
(see step 2.1).

 

 

Ensure that the two pins of the clamp 
engage correctly with the holes in the roof 
rail. 

 

Thread the coach bolt through the clamp 

and the leg.

 

 

 

Tighten the red plastic knob. Do Not Over 

Do Not Over 

Do Not Over 

Do Not Over 

Tighten

Tighten

Tighten

Tighten. 

 

Ensure the red plastic knob is in the position 
above and refit covers. 

 

Repeat for all four legs. 

2.2 

2.3 

2.1 

 

Locate two holes at each position along the roof 
rail.

 

 

Place crossbars approximately above these 
holes on roof rails.

 

2.4 

Pins engaged 
correctly 

Opening for 
clamp 

2. Positioning Crossbars on Roof Rail 

Reviews: