MAINTENANCE
Before performing any work under the raised
platform, always install the safety prop provided.
1) Wipe off all grease fittings with a clean cloth
before adding grease in order to avoid injecting
dirt or sand.
2) Repair or replace damaged grease fittings.
3) Lubricate all grease fittings every 20 hours of
operation.
4) Check all bolts on wheels after first 5 hours of
operation and then every 50 hours of operation.
5) Lubricate panel release mechanism, front and rear,
every 20 hours of operation.
6) Check tire pressure every 50 hours of operation,
adjust according to manufacturer's
recommendation indicated on the tires.
7) Check brakes once a year and adjust or repair if
necessary.
8) Open, clean and lubricate wheel bearings once a
year.
9) Check all nuts and bolts once a year. If necessary
use torque chart on page 25.
- 10 -
5
Summary of Contents for P-5103S/4E
Page 1: ...No C1060R1 01 04 OPERATOR S PARTS MANUAL Dump Trailers Models P 5103S 4E P 516 3S...
Page 2: ...Copyright Les Machineries Pronovost Inc 2004 All rights reserved Printed in Canada...
Page 4: ......
Page 13: ...13 8 DUMP TRAILER P 5103S 4E 170 02345R1...
Page 16: ...DUMP TRAILER P 516 3S 16 8 170 02353...
Page 23: ...POWER PACK 613 00000 23 8...
Page 27: ......