4.4
TABLE 4.1 TECHNICAL INSPECTION SCHEDULE
DESCRIPTION SERVICE
OPERATION
FREQUENCY
Condition of safeguards
check the technical condition of safeguards, if
complete and correctly mounted.
Operation of main brakes
Attach trailer to the tractor and test the brakes
after moving off.
Correct operation of lights
and indicators.
After connecting trailer to the tractor activate in
sequence individual lights, check if all
reflective lights are installed, check if slow-
moving vehicle warning sign is in place.
Technical condition of the
hydraulic system.
Check tightness of hydraulic system, inspect
cylinders and hydraulic conduits.
Check technical condition
of tyres and tyre pressure,
Visually inspect the tyres and if they are
properly inflated.
Before each use
Check technical condition
of tyres and tyre pressure,
Check the condition of tyre tread, lateral
surfaces, wheel rim and if necessary inflate the
tyres up to recommend pressure
Technical condition of the
brake system.
Inspect all individual elements of the system,
check the conduits for wear and tear, check
connector sealing, drain water from the air tank
(for pneumatic brake system), when connected
to tractor, move off and apply brakes to verify
that they work properly and braking is uniform.
Technical condition of the
hydraulic system.
Carefully inspect the system, check sealing of
hydraulic cylinders, check hydraulic conduits
for damage and wear and tear, check all
connections.
Every month
Check of all main nut and
bolt connections are
properly tightened
Torque values should be according to table
(
5.5
).
Every six
months
Lubrication
Lubricate elements according to guidelines
presented in section "lubrication points".
Accordi
ng to
table
(
5.4
)