ProMaxX Rocky II User Manual Download Page 2

 
Congratul
replaceme
engines.  
debris prio
above usin
(see abov
depth of th
PENETRA
manually t
edge is m
seconds.  
the angula
Retract th
the life an
ProPlate™
eight to te
from this o
approxima
and replac
blade and
for five to 
immediate
from the e
against th
carefully a
EXCEED 
torque lim
ProMAXX
ProBushin
SSSC266
blow the d
clean the 
support at
 
NOTE: Pr
head incre
GENUINE
MAX: SSS
SSSC266
and PPG5
one ProFa
 

PROMAX
REPEATA
OPTIMUM

 

ations on your 

ent of broken e

Used properly,

or to mounting 

ng the included

ve) precision-m

he bit.  Place o

ATING OIL/SP

turning the chu

aintained.  Wh

This initial pro

ar surface of th

e bit and clean
d cutting action

™ manually as 
en second interv

operation.  Rep
ately ¼” from c

ce the SSSC12

 insert the proj
ten seconds.  T

e success of ex

end of the extra

e cylinder head

apply torque, fir

80 IN-LBS OF 
itations stated 

X® offers and re

ng™ PPB188II 

6 and PPB266II

debris clean an

remaining thre

t 724-941-0941

roMAXX® 

does

easing complex

E PROMAXX® 

SC125 @900 R

6@200.  NOTE

5250 ProGard™

ast™ fastener i

XX TOOLING IS

ABLE RESULT

M PERFORMA

SAFETY PRO

GLASSES/GO

purchase of th

exhaust manifo

, this device ca

the ProMAXX®

d ProFast™ PP

achined tooling

one drop of Pro

RAY OR OTHE

uck until the Pro

ile applying lig
cess is critical 

he damaged stu

n the debris from

n of the tooling

described prev

vals and while 

peat this step fo

contacting the b

25 ProDrill™ w

ecting pin of th

This operation 

xtracting the da

actor.  Tap the 

d. While holdin
rst in the clockw

TORQUE.  Re

above.  If  the 

ecommends (h

(see above) fo

I ProBushing™

nd follow with th

ads free of all d

1 for recommen

s not

 recomme

xity to extract.  

PARTS.  Tooli

RPM, SSSC188

: Some air ratc

™ at 

www.prom

in any open ho

S SPECIALLY 
TS USING YOU

ANCE AND EXT

OCEDURE:  AL

OGGLE AND P

he

 

new ProMAX

ld mounting stu

an significantly 

® ProPlate™.  

PF008 precisio

g bit into an air

oLube™ PPL00

ER LUBRICAN

oDrill™ slips in

ht pressure, ac

in that it create

ud.  This reduc

m the bit with a

bit.  Once aga

viously above.  

the bit is turnin

or approximate

bushing mounte

with the optiona

he arbor into th

will remove the

amaged remna

ProTractor™ in

g the opposite 

wise direction, 

epeat this motio

damaged stud

ighly recomme

ollowed by the 

™ tooling to follo

he optional high

debris. Use a d

ndations and p

nd tapered left

In addition, the

ing cutting spe
8@300, SSSC

chets may not g

maxxtool.com

.  

ole.   

ENGINEERED

UR NEW DEVI
TENDED WAR

LWAYS USE A

PROTECTIVE G

XX® Exhaust M

uds in the Ford

reduce repair t

Once cleaned,

n stainless ste

r-powered drill a

01 machinist cu

NTS.  Insert the

nto the bushing

ctivate your dril

es a “seat” for t

ces the probabi

a shop towel w

ain, place one d

While continuo

ng, extract the 

ely every ten se

ed in the ProPl

l ProCutter™ P
e hole created 

e burr and corr

nt.  Utilize the 

n to the depth o

end of the Pro

and then in the

on several time

d fails to release

ended for Ford 

ProTractor™ P

ow the SSSC18

h-quality ProMA

drill depth stop 

rocedures. 

-handed screw

ese extractors 

eds (Under loa

C266@250.  OP

generate suffic

Use optional P

D TO CLOSE T

ICE.  SPECIFY

RRANTY COVE

APPROPRIATE

GLOVES WHIL

Manifold Repai

d Modular V8 g

time.  Before u

, mount the Pro

el fasteners.  In

and use the dr

utting oil or equ

e mounted ProD

 and contacts t
l both on and o

the bit to rest a

lity of tooling b

hich will remov

drop of ProLub

ously running y

bit while maint

econds progres

ate™.  Once th

PPC007A.  Add

from the ProD

rosion that ofte

optional spline

of the line. Plac

oTractor™ and 

e counter-clock

es slowly increa

e, 

STOP

 

and re

6.8L V-10) usin

PPT188.  In ext

88.  This step w

AXX® ProCha

collar for large

w extractors as 

cannot be turn

ad): MIN: SSSC

PTIMUM: SSSC

ient RPM unde

ProPin™ where

TOLERANCES

Y PROMAXX®

ERAGE

.   

E SAFETY EQU

LE USING THI

r Kit!  We engin

as and Ford 6.
se, it is recomm

oPlate™ to the

nsert the prope

rill depth gauge

uivalent on the 

Drill™ into the 

the surface of t

off in approxim

and ensures tha

bit breakage an

ve steel fragme

e™ PPL001 to

your drill at the 

taining it in the 
ssively exerting

he machining o

d two drops of 

Drill™.  Apply m

en restrict remo
ed ProTractor™

ce the included

using a high-q

kwise direction 

asing applied t

emove the Pro
ng the optiona
treme cases, u

will leave only t

ser™ PPC008

er bits.  In the u

they have the 

ned clockwise t

C125/SSSC030

C125/SSSC03

er load to be ef

e only one tapp

S (+) .000” AN

® GENUINE RE

UIPMENT INC

IS DEVICE AN

ProM

neered this kit 

.0L/6.4L/INT’L 
mended that th

e cylinder head

er ProBushing™

e machined into

end of the bit p

hardened stee
the damaged s

ately one seco

at the bit will st

nd drilling off ce

ents that have b
o the end of the

 proper RPM, s

bushing to allo

g more pressur

operation is co

ProLube™ PP

moderate press

oval of the dam

™ PPT125 by p

d slip-nut over t

quality calibrate

 to loosen the d

torque and bein

oTractor™.  In m

l ProDrill™ SS

utilize the optio

the threads of 

8 or ProTap™ P

unlikely event a

potential to de

to unlock the da

0 @300 RPM, 

0 @500 RPM, 

ffective.  SEE P
ped hole is ava

D (-) .002” TO

EPLACEMENT

CLUDING OSH

ND PERFORMI

MAXX®

 

Bushi

for fast and ea
Diesel 365 and

he cylinder hea

 in any one of t

™ and corresp
o the ProPlate™
prior to drilling. 

l drill bushing f

stud. This will e

ond intervals fo

tay on stud cen

enter of the dam

been case hard

e bit and reinse

slowly apply m

ow the bit to “cl

re until the drill 

mplete, remove

PL001 to the en

ure, toggling yo

maged stud ther

lacing a mark a

the ProTractor

ed torque wren

damaged stud

ng careful NOT

more challengi

SC188 and the

nal ProMAXX®

the broken stu

PPT008 precis

an extractor fail

form the remna

amaged remna

SSSC188@20

SSSC188@25

ProMaxx® ProR

ailable, mount t

 ENSURE ACC

T PARTS AND 

A APPROVED

ING THIS OPE

ng

 

Selection

 

asy removal an

d MaxForce7®

ad be free from 

the positions s

onding ProDril

™ to set the pr

 AVOID 

first by slowly a

ensure the cutt

r five to ten 

nter and not fol

maged stud.  

dened and exte

ert the bit into th

ore pressure fo

lean” cutting de

chuck is 

e the ProPlate

nd of the cutter 

our drill on and

reby increasing

approximately 

r™ and slide it 

ch, slowly and 

.  DO NOT 

T TO EXCEED

ing cases, 

e correspondin

® ProDrill™ 

d remaining. S

ion machinist t

ls, contact tech

ant in the cylind

ant.  USE ONLY
00, SSSC266@

50, 
Ratchet #PPR5

he ProPlate™ 

CURATE AND

TOOLING FO

D SAFETY 

ERATION. 

Chart

 

 

® 

hown 
l™ 
oper 

and 

ing 

low 

end 

he 
or 

ebris 

™ 

d off 
g your 

¼” 

up 

safe 

imply 

ap to 

hnical 

der 

@150.  

5250, 

with 

 

Reviews: