
Proliphix EPA-20 and EPA-60 Installation Guide, Release 1.0
1
Part No. 600-01004-000, Rev. 2
Beta Draft Confidential
Overview
The Proliphix EPA-20 and EPA-60 Installation Guide describes how to install the
Proliphix Ethernet Power Adapter 20 (EPA-20) and Ethernet Power Adapter 60
(EPA-60).
Before you Begin
Before you can install the EPA-20 and EPA-60, you must:
Determine a suitable location for the adapter, preferably near the Network switch
or router.
Verify a CAT5, CAT5E, or CAT6 cable is installed between the adapter and the
Proliphix thermostat.
Installing the EPA-20 and EPA-60
The following tools are required to install the EPA-20 and EPA-60:
#2 Phillips head screwdriver
110 punch down tool, included
Mounting and Wiring the EPA-20 and EPA-60
This section describes how to mount and wire the EPA-20 and EPA-60.
1
Remove the adapter from packaging.
2
Mount the adapter with 1” screws provided.
3
Strip the end of the CAT5, CAT5E, or CAT6 cable sheathing approximately 1 ½”.
Caution
The EPA-20 and EPA-60 should only be powered with the Proliphix power supply
included with the EPA-20 and EPA-60. Do not power the EPA-20 or EPA-60 with
any other power supply.
Note
You can attach up to two Proliphix thermostats to a single EPA-20 adapter and up
to six Proliphix thermostats to a single EPA-60 adapter.
Note
I
If the adapter is being installed on wallboard then anchors may be necessary.