![ProKlima 2149996D Operating Instructions Manual Download Page 13](http://html1.mh-extra.com/html/proklima/2149996d/2149996d_operating-instructions-manual_1614287013.webp)
13
V.Installation and adjustment
1.Installation
:
Warning: before using the mobile air conditioning, keep it upright forat
least two hours. The air conditioning can be easily moved in the room.
1
)
take out the outer connector assembly and the exhaust pipe
assembly, and remove the plastic bags;
2
)
insert the heat pipe assembly (the end of the exhaust joint) into
the back panel vent slot (push to the left) and complete the assembly
(as shown in figure 1).
1.2
Installation of window sealing plate components
1
)
Half open the window
,
and mount the window sealing plate
assembly to the window (as shown in Fig.2 and Fig.3).Components
can be placed in horizontal and vertical direction.
2
)
Pull various components of the window sealing plate assembly
open, adjust their opening distance to bring both ends of the assembly
into contact with the window frame, and fix various components of the
assembly.
1.2 Install the window sealing plate assembly.
Notes:1
)
the flat end of the exhaust pipe joints must be snapped into
place.
2)The pipe cannot be distorted nor has substantialturning
(greater than 45 ° ).
Keep the ventilation of the exhaust pipe not blocked.
Figure 2
Figure 3