Roof Section Stages
Roof Section Stages
1m Wide
Only 1 screw is required
to hold the back in place
in this stage.
Repeat previous roof
section fixing stages
115mm Metal
Roof Screws
* Use Step ladder when
fixing the roof sections,
2 people are required.
ID: 21150
Roof Section Stages
505mm
Wide
Position the last roof section.
Secure with metal screws.
115mm Metal
Roof Screws
* Use Step ladder when
fixing the roof sections,
2 people are required.
Side
Back
Back
Side
(LEFT)
ID: 21158
Roof Section Stages
1m Wide
Position the 1m wide roof
section and slot it into the
first roof section. Fix in
place with metal roof screws
115mm Metal
Roof Screws
ID: 21150
Water Deflector Flashing Length Size
Building size
10x6
L3115mm x 1
Water Deflector Flashing Lengths
Back View
Barge Board Flashing Stages
Position the Barge Board
Flashing on both side of
roof sections. Fix the
flashing through the top
ridge of metal roof.
2292mm
ID: 21178
115mm Metal
Roof Screws
115mm Metal
Roof Screws
Back
Position and fix the
Water Deflector Flashing
and fix through the top
ridge of metal roof
The screws already in
the roof will need to be
removed before the
flashing fitted.
Water Deflector Flashing Stages
ID: 21182
61
64
65
66
62
63