
7.
Attaching the Fan
Blades
Figure 13
Finishing the Fan
Installation
STANDARD CEILING MOUNTING
1. Align the locking slots of the ceiling
canopy with the two screws in the
mounting plate. Push up to engage the
slots and turn clockwise to lock in place.
Immediately tighten the two mounting
screws firmly.
2. Install the remaining two mounting screws
into the holes in the canopy and tighten
firmly.
3. Install the decorative canopy ring by
aligning the ring’s slots with the screws in
the canopy. Rotate the ring clockwise to
lock in place.
4. You may now proceed to attaching the
fan blades.
WHEN USING THE STANDARD BALL/DOWNROD
MOUNTING, THE TAB IN THE RING AT THE
BOTTOM OF THE MOUNTING PLATE MUST
REST IN THE GROOVE OF THE HANGER BALL.
FAILURE TO PROPERLY SEAT THE TAB IN THE
GROOVE COULD CAUSE DAMAGE TO WIRING.
Screws
Motor Assembly
Blade
1. Attach the blade to the the fan motor
assembly, align the screw holes in the
blade with the screw holes above and
under the motor assembly, and secure
the blade with blade arm screws.
2. Repeat this step for the remaining the
blades.
Summary of Contents for AirPro P250009
Page 1: ...P250009...