To fit the antenna connector,
place the M8 washer inside the
box and the M6 isolator outside,
then fit the nut.
To assemble the box format, follow the same steps as the buid in format, changing points 6 and 7 for:
7
Reconnect the cables
disconnected in point 3.
Place the antenna connector
in the hole made, and fasten
it with a glower washer and
nut.
8
7
Close the equipment by fitting
the screws, and connect the
antenna cable and the antenna.
9
Power the controller and
realize the corresponding
configuration using the manual
provided “Agrobee-L User
Manual - Configuration and
consultation for Agrónic 2500
and Agrónic 5500”.
The installation of the Agrobee-L
coordinator circuit has already
been completed.
Don’t power the controller without
first connecting the antenna, as
the coordinator may be damaged.
11
12
Place the antenna at a high
point to achieve correct
coverage.
10
R-2314
Polígon Industrial, C/ de la Coma, 2 | 25243 El Palau d’Anglesola | Lleida | España
Tel. 973 32 04 29 | [email protected] | www.progres.es
Sistemes Electrònics Progrés, S.A.
MOUNTING BOX FORMAT
IMPORTANT
Drill a hole on the right side
as indicated in the image.
6
58 mm
Diameter
6,5 mm
34 mm
INSIDE
OUTSIDE
INSIDE