Assembly
Usage
TraXion Engineered Products | ProGear Line
Instructions v1 | 3-700
4
With the Lower Ladder Section folded down, slide the Upper
Ladder Section into the channels of the Lower Ladder
Section. Slide it all the way in.
5
Assemble the cable management
system by first threading the stop-
nut onto the threaded end of the
Pigtail.
Next thread the pigtails into the two
connection points on the right side
of the ladder. Thread in at least six
turns.
Once satisfied with the placement of
the Pigtails tighten the stop-nut
against the threaded connector.
Adjusting the Height
Pivot the ladder section straight up and down as in Picture 1. Make
sure the Triangle Brace is also hanging straight up and down.
Adjust the sliding Upper Ladder Section to the desired height.
Locate the height adjustment hole as shown in Picture 2.
Picture 1
Picture 2
Pivot the ladder section forward. Make sure the locking
tab at the top of the Triangle Brace slots into the height
adjustment hole.
Pin the bottom of the Triangle Brace to the I-Beam as
shown in Picture 3.
Picture 3
It is very important that you secure the base with the locking pin. Without the
locking pin the ladder sections could collapse.
IMPORTANT