6
1. Identify the Rear Stabilizer (4). While another person
lifts the rear of the Frame (1), attach the Rear
Stabilizer to the Frame with two M10 x 75mm Carriage
Bolts (34) and two M10 Nylon Locknuts (29).
4
34
29
29
1
2. See the inset drawing. Remove the two M10 x 45mm
Button Bolts (33) and the packing tubes from the front
of the Frame (1). Next, remove the rubber band from
the Lower Wire Harness (87). Discard the Button
Bolts, the packing tubes, and the rubber band.
Press the two Stabilizer Endcaps (35) onto the Front
Stabilizer (3). Orient the Stabilizer Endcaps as shown.
35
3
35
1
33
2
Packing Tube
Packing
Tube
1
3. Slide an M10 Split Washer (94) onto each of the two
M10 x 83mm Button Screws (63). Insert the Button
Screws into the Front Stabilizer (3). Next, slide the
Mast (15) onto the Button Screws and against the
Front Stabilizer. Make sure that the Mast is oriented
as shown.
While another person holds the Mast (15) and the
Front Stabilizer (3) near the Frame (1), connect the
Extension Wire Harness (95) to the Lower Wire
Harness (87). Insert the connectors on the Wire
Harnesses into the Mast.
While the other person lifts the front of the Frame (1),
carefully pull the upper end of the Extension Wire
Harness (95) to remove any slack. While holding
the upper end of the Extension Wire Harness,
attach the Mast (15) and the Front Stabilizer (3) to the
Frame with the two M10 x 83mm Button Screws (63).
Do not tighten the Button Screws yet.
Make sure that the Wire Harnesses (87, 95) do not
get pinched and damaged during this step.
94
3
1
63
3
15
95
87
Pull
Make sure that the
wire harnesses do
not get pinched
and damaged
during this step.
87