12
20. Orient the Locking Bar (50) as shown. Slide the
Barbell (51) through the Left Barbell Guide (52),
the Locking Bar, and the Right Barbell Guide (53).
Make sure that the Barbell is centered in the
Barbell Guides.
Engage the Locking Bar into the
Uprights (43) at the lowest position.
23. Route the Cable (61) over a Pulley (63) and down
through the Top Frame (45). Attach the Pulley
inside the Top Frame with an M10 x 67mm Bolt
(86), two M10 Washers (80), two 16mm x
12.5mm Spacers (76), and an M10 Nylon Locknut
(77).
21. Hand tighten an M8 x 20mm Button Screw (16)
into the Left Barbell Guide (52).
Slide a Weight Stop (69) onto the Barbell (51).
Hand tighten an M6 x 15mm Button Screw (96)
into the Weight Stop.
Make sure that the Button
Screw is tightened enough to engage the hole
(see drawing 20) in the Barbell.
Repeat this step on the other side of the
Barbell (51).
Tighten the Button Screws used in this step,
and the Bolts and Nylon Locknuts used in
steps 11–15 and 17–19.
Press two Center Base Feet (60) onto the Center
Rack Base (39). Press the Rear Upright Foot (59)
onto the Rear Upright (41). Press two Front
Upright Feet (64) onto the Front Uprights (43).
22. Route a Cable (61) up through the Top Frame
(45) and over a Pulley (63). Attach the Pulley
inside the Top Frame with an M10 x 67mm Bolt
(86), two M10 Washers (80), two 16mm x 12.5mm
Spacers (76), and an M10 Nylon Locknut (77).
53
50
52
Hole
20
21
16
52
51
96
69
43
43
61
86
22
23
80
76
80
77
63
45
76
61
86
80
76
80
77
63
45
76
60
60
59
39
41
64
51