OPERATING DETERMINATIONS
Consider the respective national norms during the installation.
The fixture should be hung on a truss structure using a mounting clamp
(not included). The fixture can be - 180°.The required tilt angle of
the fixture can be adjusted by means of knobs on the side of the fixture.
The installation must always be secured with a secondary safety
attachment, e.g. an appropriate cord . Fasten the safety cord through the
mounting yoke and over the trussing system.
The operator has to make sure the standard of safety-relating and other
machines.
The fixture should be installed outside areas where persons may walk by
or be seated.
IMPORTANT! Overhead rigging requires extensive experience, including
calculating working load limits, installation material being used, and
periodic safety inspection of all installation material and the projector.
Improper installation can result in bodily injury and. or damage to
property. The fixture must never be fixed swinging freely.
Before rigging make sure that the installation area can hold a minimum
point load of 10 times the fixture’s weight.
DANGER OF FIRE !
When installing the device, make sure there is no highly inflammable
material in a distance of min. 0.5m.
Install the device in a ventilated location.
MAINTENANCE
Keep the unit dry.
Periodically clean the frontal panel of the unit with a dry cloth.
Never use alcohol or solvents.
In order to maintain adequate cooling, dust must be cleaned from the
surface.
Replacing the fuse
Replacing the fuse
Replacing the fuse
Replacing the fuse
-
Before replacing the fuse, unplug mains lead.
-
Remove the fuse holder on the rear side of the unit.
-
Remove the old fuse from the fuse holder.
-
Install the new fuse in the fuse holder.
Summary of Contents for PLAB2CN
Page 1: ...BLINDER PLAB2CN PLAB4CN PLAB8CN ...
Page 9: ...9 NOTE ...
Page 10: ...10 NOTE ...
Page 11: ......
Page 12: ...12 ...