15
4.v Device maintenance
a)
Periodically clean the device with a dry cloth
b)
Periodically check that the ventilation openings are not obstructed
c)
Periodically check the wiring and connections
d)
Periodically check the efficiency of the earthing connection
e)
Replace the Pb-Gel batteries every 4 years with units having the same voltage and capacity
f)
Replace the CR2032 battery of the internal clock (see par. 4s) every 4 years
g)
Check the status of EVAC and ALARM messages.
Summary of Contents for AE604
Page 2: ...AE604 INTEGRATED VOICE ALARM SYSTEM EN54 16 EN54 4 ...
Page 40: ...40 USRMAN_AE604EN_REV002 MECHANICAL DIMENSIONS ...
Page 42: ...42 USRMAN_AE604EN_REV002 ...
Page 43: ...43 ...
Page 44: ...44 USRMAN_AE604EN_REV002 ...
Page 46: ...46 USRMAN_AE604EN_REV002 ...
Page 47: ...www proel com ...