7.3 Wet measurements
The ZRM 6006 is perfectly suitable for measuring night and day visibility on wet
roads and on moistened road markings (e.g. according to the “bucket” method)
•
Set a timer (e.g. stopwatch) depending on the standards
•
Moisten the road marking in the required
way, e.g. with the “bucket” method.
The ZRM 6006 should be far enough away that it will not get wet.
•
Start the timer.
•
Wait until approx. 10 seconds before the timer setting expires and set the
instrument onto the previously moistened road marking.
•
Start the measurement when the timer reached zero.
Never pour water on the instrument.
Never dip the ZRM 6006 into water.
Do not expose the ZRM 6006 to the rain.