Proceq N / L Operating Instructions Manual Download Page 18

16 

Maintenance 

© 2017 Proceq SA

•  Turn knurled screw (33) to rewind the recording paper 

from reel (31) to reel (32).

•  Pull out the knurled screw (33) until it locks and then 

remove the reel (32).

•  Insert a new roll with the text "Value 100" on the side 

closest to the knurled screw (33).

•  If the knurled screw (33) does not engage, turn the reel 

(32) until the knurled screw (33) starts turning with it as 
well.

•  Cut off the start of the paper strip like an arrow and 

insert it into the slot in reel (31).

•  Tension the paper by turning the reel (31).

3 .4 Storage

Prior to the storage of the hammer in the original case 
release the impact as during a measurement and fix the 
plunger (1) with the push-button (6). Secure the push-
button additionally with a strong adhesive tape.

3 .5  Maintenance Procedure

We recommend that the concrete test hammer should
be checked for wear after 2 years at most and be  
cleaned. Do this as described below.

 

The concrete test hammer can either be sent  

  to a service center authorized by the vendor or 

 

else it can be maintained by the operator  

 

according to the following description.

The items (in brackets) are illustrated in Fig. 3.3, 
"Lengthways section through the concrete test hammer" 
on page 18.

3 .5 .1  Stripping Down

 Warning!

 

Never strip down, adjust or clean the pointer  

 

and pointer rod (4) (see Fig. 3.3, page 18),  

 

otherwise the pointer friction may change.

 

Special tools would be required to readjust it.

•  Position the concrete test hammer perpendicular to the 

surface.

 Danger!

 

The impact plunger (1) generates a recoil  

 

when it deploys. Therefore always hold the  

 

concrete test hammer with both hands!  

 

Always direct the impact plunger (1)  

 

against a hard surface!

•  Deploy the impact plunger (1) by pushing the concrete 

test hammer towards the surface until the pushbutton 
(6) springs out.

•  Unscrew the cap (9) and remove the two-part ring (10).
•  Unscrew the cover (11) and remove the compression 

spring (12).

•  Press the pawl (13) and pull the system vertically up 

and out of the housing (3).

Summary of Contents for N / L

Page 1: ...Bedienungsanleitung Operating Instructions Mode d emploi Betonpr fhammer Concrete Test Hammer Scl rom tre b ton N L NR LR...

Page 2: ...Switzerland Tel 41 0 43 355 38 00 Fax 41 0 43 355 38 12 E Mail info proceq com Internet www proceq com Technische nderungen vorbehalten Subject to change Modifications techniques r serv es Copyright...

Page 3: ...3 2 Measurement 4 Measuring Principle 4 Measuring Procedure 4 Outputting and Evaluating Data 5 Conversion Curves 6 Factors Affecting the Values 11 3 Maintenance 15 Performance Check 15 Cleaning After...

Page 4: ...cannot be upheld if they are due to one or more of the following causes Failure to use the concrete test hammer in accordance with its designated use Incorrect performance check operation and mainte...

Page 5: ...vent that certain rules of behavior are disregarded Warning This note warns you about the risk of material damage financial loss and legal penalties e g loss of warranty rights liability cases etc Thi...

Page 6: ...the items to be tested prior to measurement in order to prevent the material deflecting Items made from artificial stone which are sensitive to impacts Preferably perform measurements at temperatures...

Page 7: ...the rebound value R indi cated by the pointer 4 on the scale 19 If you are using models NR and LR the rebound value R is automatically printed on the recording paper It is only necessary to lock the i...

Page 8: ...dle of the row is the median value If more than 20 of the values are spaced more than 6 units apart the measuring series must be rejected as mentioned in the standard 2 4 Conversion Curves 2 4 1 Deriv...

Page 9: ...and min values are set so 80 of all test results are included 2017 Proceq SA Measurement 7 Conversion Curves Concrete Test Hammer Model N NR Concrete pressure resistance of a cylinder after 14 56 day...

Page 10: ...Average pressure resistance of a cube probable value The concrete test hammers shown in Fig 2 7 and Fig 2 8 indicate the impact direction Conversion Curves Concrete Test Hammer Model L LR Concrete pr...

Page 11: ...x and min values are set so 80 of all test results are included 2017 Proceq SA Measurement 9 Conversion Curves Concrete Test Hammer Model N NR Concrete pressure resistance of a cylinder after 14 56 da...

Page 12: ...g 2 7 together with the B Proceq curve The curves are valid for horizontal impacts and for the conversion to a compressive strength in N mm2 evalu ated with concrete cubes 150 150 150mm For other impa...

Page 13: ...hine depends on the shape and size of the sample The samples prescribed for use in the particular country must be taken into account when converting the rebound value R into compressive strength In th...

Page 14: ...coeff Zf Rm n c Rm n c Zf Rm carb Average rebound value R measured on carbonate impregnated concrete surface Rm n c Average rebound value R measured on non carbonate impregnated concrete surface Anoth...

Page 15: ...sh 23 28 28 34 34 39 39 45 45 50 0 0 1 0 2 0 3 0 4 0 5 0 6 0 100 90 80 70 60 Fig 2 11 Reduction of Rebound values due to Carbonation 2017 Proceq SA Measurement 13 Carbonation Depth inmm Reduced R Valu...

Page 16: ...efore the test Very high values for compressive strength 70N mm2 can be achieved by adding pulverized fuel ash or sili ca fume However these strengths cannot reliably be ascertained using the rebound...

Page 17: ...testing anvil Fig 3 1 Performance check of the concrete test hammer model N L shown Proceed as described in Maintenance Procedure on page 16 if the values are not within the tolerance range specified...

Page 18: ...Do this as described below The concrete test hammer can either be sent to a service center authorized by the vendor or else it can be maintained by the operator according to the following description...

Page 19: ...ps is ample viscosity ISO 22 e g Shell Tellus Oil 22 Insert a new felt ring 18 into the cap 9 Apply a small amount of grease to the screw head of the screw 20 Slide the hammer guide bar 7 through the...

Page 20: ...t surface 3 Housing 4 Rider with guide rod 5 Not used 6 Push button complete 7 Hammer guide bar 8 Guide disk 9 Cap 10 Two part ring 11 Rear Cover 12 Compression spring 13 Pawl 14 Hammer mass 14 1 mode...

Page 21: ...325 x 295 x 105mm Grindstone 1 pce 1 pce 1 pce 1 pce Recording paper 3 rolls 3 rolls 4 2 Accessories Concrete test hammer Model N Model NR Model L Model LR Accessory article number Testing anvil 310 0...

Page 22: ......

Reviews: