TECHNICAL FILES
TECHNISCHE FICHE
T1.16B.N
PICTURE 2
TEKENING 2
PICTURE 3
TEKENING 3
3
PICTURE 1
TEKENING 1
1 - Please mark the wall to place the internal part T1.16BI.
2 -After marking four fixation points, drill the wall.
3- Screw the plate with compatible bolts, leaving them with enough slack
for the following step.
1- Teken de bevestigingspunten voor het inbouwlichaam op de muur af.
2- Boor na het aftekenen van de vier bevestigingspunten de gaten in de
muur.
3- Schroef de bevestigingsplaat tegen de muur met voldoende speling voor
de volgende stap.
1 - After the plate is placed, please place a level on top of the styrofoam to
confirm the piece is levelled with the floor. After guaranteeing it is
levelled please finish screwing the bolts.
2 - Proceed to the water connections, connecting cold and hot water to the
correspondent tubes.
3- Please guarantee that these connections are done correctly before
placing the coating on the wall.
1- Nadat de bevestigingsplaat is geplaatst, dient met behulp van een
waterpas op het piepschuim, het inbouwdeel waterpas gezet te worden.
Schroef definitief vast wanneer dit het geval is.
2- Verbind de ingangen voor koud en warm water op de respectievelijke
toevoerleidingen.
3- Test de verbindingen op waterdichtheid alvorens de muur te bekleden.
COLD WATER INLET
KOUD WATER TOEVOER
HOT WATER INLET
WARM WATER TOEVOER
1 -Verify the maximum and minimum measurement to lay down the
coating.
Minimum 70mm | Maximum 90mm
2 - After verifying the correct distance to apply the coating, please
proceed.
1 Gelieve rekening te houden met de minimum en maximum inbouwdiepte
bij het aanbrengen van de wandbekleding.
Minimum 70mm | Maximum 90mm
2 -Na het controleren van de inbouwdiepte kan de wandbekleding
aangebracht worden.
ASSEMBLY INSTRUCTIONS
MONTAGE INSTRUCTIES