Installation
15 / 42
V2
GB
5.2
Hydraulical connection
Two separate hydraulic circuit are required to connect the
HVZ
to the carrier
The connection of the hydraulic hoses takes place on the hydraulic rotator.
The opening width between the bolt sockets can be adjusted (
) by loosening of the locking screws. Remove both
bolt sockets and rotate them at 180° (see arrows). Insert the two bolt sockets again and secure them with locking
screws.
Connection RED for
clamp movement
„close
“
Connection for
rotating head
movement
to the right
Connection for
rotating head
movement
to the left
Connection YELLO for
clamp movement „
open
“
Locking screws
Locking screws