background image

7

PROBRITE.COM

Please call 1-844-507-5651 or email [email protected] for further assistance.

6

Visit 

www.probrite.com/install

 for installation video tutorials and product support

Installation (continued)

3

Remove the 
mounting base plate

C

D

D

D

E

D

NOTE: 

The mounting plate tightening screws 

(C) comes pre-installed on the light fixture.

 

Loosen the two mounting base 
tightening screws (C) using a philips 
screwdriver and remove the refractor.
(Fig. 1)

 

Remove the reflector from the base 
plate (D)  by loosening the two small 
screws.  (Fig. 2)                                

4

5

Knock out holes on 
mounting base

Installing the mounting base

Installation (continued)

6

Making the electrical 
connections

(fig 1).

(fig 2).

(fig 1).

(fig 1).

(fig 1).

(fig 2).

Junction box Mount

Junction box Mount

Surface Conduit Mount

 

Route the junction box wires through 
the large center hole in the mounting 
base (D).

 

Align the holes on the mounting 
base (D) with the holes on your 
junction box. Use two #8 screws (AA), 
depending on the size of the holes in 
your junction box, attach the mounting 
base (D) to your junction box. (Fig. 1)

 

Follow the wiring instructions 
given below to make the electrical 
connections. (Fig. 1)

 

Mark and drill two holes on the wall 
surface as per the desired location for 
fixing the mounting plate (D).

 

Use two or more suitable screws 
(provided by others) applicable to 
the surface of mounting and fix the 
mounting plate (D) on the surface. 
(Fig. 2)

 

Measure the distance of the mounting 
threaded holes on the junction box and 
find the corresponding knock-out holes 
in the fixture's mounting base (D).

 

Use a flat head hammer and screw 
driver to knock out two holes in the 
mounting base (D) in the desired 
location to align properly with the 
junction box. (Fig. 1)

Small screws

Reflector

CAUTION: 

DO NOT touch the LED and Photo-

cell lens (E) inside the fixture. DO NOT damage 

or soil the reflector.

D

AA

Screws 

(Provided by others)

Summary of Contents for LYRA20-PC-4K-BZ

Page 1: ...ng Parts Need Accessories Visit us online anytime or call us to get information on our product range download detailed spec photometric files find product and mounting accessories view installation tu...

Page 2: ...fixture to cool before touching NOTICE Do not connect this fixture to a dimmer switch Pre Installation PLANNING INSTALLATION Before installing the light fixture ensure that all parts are present Comp...

Page 3: ...at least 1 1 2 inch in depth for proper installation for recessed mount application fig 2 fig 2 2 Shut electric power off At wall switch verify it is in the off position fig 1 At the main electrical...

Page 4: ...mounting base D Align the holes on the mounting base D with the holes on your junction box Use two 8 screws AA depending on the size of the holes in your junction box attach the mounting base D to you...

Page 5: ...e fixture as per the instructions given below To enable dusk to dawn operation remove temporary black label cover and ensure the photocell E has no cover on it and is unobstructed Ensure the switch po...

Page 6: ...ted light OR place the optional photocell cover over the photocell light sensor and use the wall switch to turn the light ON and OFF Light FLICKERS The light fixture is wired through a dimmer switch D...

Page 7: ...PROBRITE Customer Service 9am 5pm EST Monday to Friday 1 844 507 5651 support PROBRITE com PROBRITE COM Questions Missing Parts Need Accessories RETAIN THIS MANUAL FOR FUTURE USE Para las translacione...

Reviews: