9
Install Head Platform assembly (leveling arm up) to the end of the smallest section with the provided
bolt, shaft collars, washers and nut. Tighten all the Allen bolts and nuts to secure properly.
NOTE: Install the pan tilts head.
Now Join 2.4ft cable, 6.9ft cable & 7.9ft cable with yellow sleeves.
Attach one end of cable to slot on head platform with the help of wire tensioner and another end with
the cable already attached to central fork with wire tensioner as shown below.
Head Platform Setup
Cable attached to
central fork
Loosen the knob on rear section, remove closers from weight bar and insert it to slot on rear section.
Retighten the knob to ensure slip free connection.