
www.pro-team.com 866.888.2168
26
Power Nozzle
ASSEMBLY
Install motor, brush roll, and belt. Be careful. Do
not attempt to over-tighten screws.
2.
Fully assembled power nozzle (bottom view).
Additional components:
a) Install sleeve and hose.
b) Install duct cover.
c) Install electronic components, Vacuum Operation Indicator Board, circuit breaker, and power nozzle lockout
switch (lockout switch XP models only – not pictured).
d) Attach jumper wire to Vacuum Operation Indicator Board.
e) Make sure components are properly seated in the base.
3.
a
b
d
Insert braces.
1.