
HARDWARE USED
(ACTUAL SIZE)
HARDWARE USED
(ACTUAL SIZE)
HARDWARE USED
(ACTUAL SIZE)
10
BAG
d
BAG E
BAG E
11
12
× 4
5 × 11 Bearing
× 2
King Pin
Axle × 2
× 2
Cross Pin
× 4
5 × 8 × 0.25 Shims
× 2
Serrated Locknut
× 2
M1.6 × 6 SHCS
REPEAT THIS STEP fOR OPPOSITE SIDE
REPEAT THIS STEP fOR OPPOSITE SIDE
Front Arms & Hinge Pin Brace to Bulkhead
Front Hub Assembly
Front Wheel Hex Assembly
× 2
Front Inner Hinge Pin
× 2
M3 Locknut
Hinge Pin Brace × 1
2 x SHIMS BETWEEN BEARING AND PIN
1
2
3