pro comp 56713B Installation Manual Download Page 11

11 

56713B/K2079B 

Revised 

2.19.15 

ILLUSTRATION 7

.   

40. Rotate the tie rod at the pitman arm 

1/2 

turn and attach it to the bottom of the new 
pitman arm.  Torque nut to 

45

 ft-lbs. 

41. Assemble and install to the axle the 

SWAY BAR LINK 

90-2357

 with the bush-

ings and 

P-843 

hardware from pack 

90-

6312

.   

 

NOTE: Some models may have a 

14mm lower sway bar hole.  If so, use the 
14mm bolts and hardware from pack 90-
6430, lower bushings and sleeves from 
pack 90-6242 on the bottom to attach the 
links to the axle. 

 

42. Use  the 

3/8” X 1 1/2” 

bolt and 

3/8” 

wash-

ers and nuts from 

90-6024 

to attach the 

90-1010 

to the sway bar end.  Use the 

3/8” X 2 1/2” 

hardware from 

90-6024 

to 

attach the 

90-2357

 to the 

90-1010.  

See 

ILLUSTRATION 8

.   

43. Repeat on the other side of the vehicle.

 

44. Install the hose clamps and screws from 

hardware pack PN 

90-6029 

to the brake 

lines. 

45. Bolt the front brake line extension brack-

ets PN 

90-1539 

to the original 

OE

 brake 

line bracket holes, on the front axle brack-
ets, using the previously removed 

OE

 

bolts. 

46. Secure  the 

OE

 brake lines to the brake 

line extension brackets PN 

90-1539 

using 

the supplied 

5/16” X 1” 

bolt and hard-

ware. 

47. Install your wheels and tires and lower the 

vehicle to the ground. Tighten the lug nuts 
to 

90

 ft-lbs.

 

3/8”  

Hardware 

3/8” X 2 

1/2” Bolt 

45359 

Bushing 

61150 3/8” 

Sleeve 

3/8”  

Hardware 

3/8” X 1 

1/2” Bolt 

90-1010 

End Link 

Sway Bar 

90-2039 

Spacer 

ILLUSTRATION 8 

Sway Bar End Link 

 P-843 

Spacer Pack 

OR 

 Hardware 

From Packs 

90-6430 and 

90-6242 

SHOCK 

UPPER 

SHOCK 

BRACKET 

COIL 

ISOLATOR 

RETAINER 

SHOCK 

BUSHING 

SHOCK NUT 

ILLUSTRATION 7 

Coil Spring/Shock 

 Install 

SHOCK 

BUSHING 

56160 or 

56170 COIL 

SPRING 

RETAINER 

Summary of Contents for 56713B

Page 1: ...formation that includes warranty information and instructions for resolving problems you may encounter Please keep it in the vehicle as a permanent record K2079B K2079BMX K2079BP 56713B 56713BMX 56713...

Page 2: ...CK Sway Bar 1 70 0371501500 3 8 x 1 1 2 USS Gr 5 Bolt 2 7 11 70 03725001500 3 8 x 2 1 2 USS Gr 5 Bolt 2 7 11 72 03700100512 3 8 USS LOCKNUT 4 7 11 73 03700030 3 8 SAE FLAT WASHER 4 7 11 73 03700042 3...

Page 3: ...LOWER ARM 4 4 8 90 8083 SLEEVE 2 4 8 Box 2 of 3 PN 56716B 2 91 7658 TRACK BAR DROP BRACKET 1 11 14 90 6874 HARDWARE PACK Track Bar Drop Bracket 1 90 4460 TRACK BAR NUT 1 11 14 90 8233 CROSSMEMBER SLE...

Page 4: ...ER 2 2 7 7 11 MX6100 REAR SHOCK MX 6 SHOCK ABSORBER 2 Box 3 of 3 PN 56713B 3 COIL SPRINGS 56160 Diesel For 56713 6 Coil Spring kit COIL SPRINGS 56170 Gas For 56713 6 Coil Spring kit Transmission Brack...

Page 5: ...p lift kit is a positive experience variations in construction and assembly in the vehicle manufacturing process will virtually ensure that some parts may seem difficult to install Additionally the cu...

Page 6: ...com pressor tool 9 Locate the top shock mount in the engine compartment Remove the nut retainer and grommet from the shock See ILLUS TRATION 2 10 Unbolt the shock absorber from the lower mount bracket...

Page 7: ...lied sleeves IMPORTANT 2010 models Install the bushings PN 15 10978 and sleeves 90 8083 from hardware pack 90 6748 into the new lower control arm front arm axle end as shown in ILLUSTRA TION 4 19 Inst...

Page 8: ...aust may need to be removed on the driver and passenger side If so remove exhaust hanger bushings Undo clamp on the turbo or unbolt from the header Move exhaust out of the way to get the control arm b...

Page 9: ...proper torque reading Install Pitman arm retaining nut and tighten until snug 29 Insert the key and unlock the steering wheel 30 Install the Pitman arm torque tool 96 5779 to the Pitman arm using one...

Page 10: ...etaining nut to the sector shaft and torque to 225 ft lbs NOTE Whether re using the exist ing pitman arm retaining nut or replac ing with a new nut thread locking com pound must be used 36 Unbolt and...

Page 11: ...on the other side of the vehicle 44 Install the hose clamps and screws from hardware pack PN 90 6029 to the brake lines 45 Bolt the front brake line extension brack ets PN 90 1539 to the original OE b...

Page 12: ...LUSTRATION 9 NOTE Be sure to use thread locker on this bolt DO NOT the bolt torque at this time 46 Insert the 7 16 X 788 split sleeve 61734 into the crossmember hole clos est to the driver side track...

Page 13: ...am to center the axle under the vehicle by rotating the cam until the measurement is equal on both sides Torque the cam bolt to 150 ft lbs 50 See the driveshaft note on page 15 See ILLUSTRATION 10 51...

Page 14: ...on the drive side 9 Install the lift block 95 300D on the axle pad and use your floor jack to raise the axle to the spring Apply a slight amount of pres sure with your floor jack against the spring p...

Page 15: ...MX6100 or ZX2001 and torque this hardware to 60 ft lbs 14 Reinstall the wheels and tires and lower the vehicle to the ground 15 Recheck the wheel lug torque on all four wheels at this time 16 Recheck...

Page 16: ...90 9 16 95 130 M14 85 120 145 5 8 135 175 M16 130 165 210 3 4 185 280 M18 170 240 290 1 2 13x1 75 HHCS Grade 5 Grade 8 M12 1 25x50 HHCS No of Marks 2 G Grade Bolt Strength P Property Class Bolt Streng...

Page 17: ...268 from BOM box 1 12 7 12 Removed BF BFR shocks from the text and from BOM box 3 Modified options box infor mation and front sway bar end link illustration 8 1 10 13 Added the side view illustration...

Reviews: